Orange County NC Website
<br />PRE-BID MEETING MINUTES <br />OC RFP No. 5289 <br />Project Name: Motor Pool HVAC Installation <br />September 10, 2020 10:00 AM Orange County Motor Pool <br /> <br /> <br />2 | P a g e <br /> <br />3. Dig Permit, Welding and Cutting Permit <br />4. Safe Plan of Action Reports <br />5. Weekly Tool Box Meeting <br />6. Fire Alarm System - (Protocol when working on or near) <br />7. Lead & asbestos awareness training <br />8. Contractor shall design and implement its own safety program to meet or exceed OC’s. <br /> <br />O. COMMISSIONING <br />1. Contractor’s responsibilities <br /> <br />P. SPECIAL CONSIDERATIONS <br /> <br />This facility will be occupied during construction. <br />All power outages are required to be approved. See attached “Request for Shutdown” form that must be <br />submitted in advanced for approval. <br />Contractor must be trained by FM Global in order to perform Hot Work. All Hot Work requires a permit <br />from Orange County for each day hot work is being performed. All permits have a minimum of a four (4) <br />hour fire watch. <br /> <br />Q. STAGING, ACCESS, PARKING, USE OF FACILITIES <br />Contractors shall provide facilities for employees. <br />Contractors shall provide work schedule. <br />Contractors shall provide drawing requesting staging and parking areas <br /> <br /> <br />R. CLEAN UP, PROTECTION OF THE PREMISES, & ENVIRONMENTAL CONSIDERATIONS <br />1. Temporary Protection, Barricades, Gates, Staging areas <br />2. Ingress / Egress to site and building <br />3. Air Quality (Control of Odors, Fumes, Noise, Dust, etc.) <br />4. Crane and major deliveries <br />5. Site cleaning <br /> <br />S. INSURANCE <br />1. Contractors are to provide and maintain Liability and Builders Risk coverage. Use of drones on <br />site requires aviation liability insurance coverage and FCC operator’s license. <br /> <br /> <br />T. CONTRACTS AND ADDITIONAL FORMS <br /> <br />1. Construction Contract Under 250K Final 11-19 <br />2. Dispute Resolution Rules and Procedures for Orange County Design, Building Construction, <br /> Renovation, and Repair Projects. <br />3. Orange County Hot Work Permit Process <br />4. Orange County Equipment Shutdown Request <br />5. Orange County Minimum Insurance Coverage Requirements <br /> <br />U. QUESTIONS <br /> <br /> 1. The building will remain in operation for the duration of this work. Firms shall plan to coordinate <br /> all work with Orange County Project Manager and Motor Pool Management. <br /> <br />DocuSign Envelope ID: 83115E6C-E328-4C43-8E3A-42C2A7503DB8