Orange County NC Website
4 | Page <br /> <br />4. Facility Dynamics assumes that the general contractor (and its Subcontractors, as <br />applicable) will contribute the appropriate Trade Specialists to participate in all <br />required startup tests/checks and FPT’s where appropriate. <br />5. This fee includes the use of our commissioning software tool (CACEA) to manage <br />much of the information necessary for Commissioning electronically. <br /> <br />Feel free to contact me if you need any further information or breakdown of costs. We would be <br />glad to meet with you or any other staff to review our detailed cost estimate and scope for this <br />project. <br /> <br />Sincerely, <br /> <br />FACILITY DYNAMICS ENGINEERING CORPORATION <br /> <br /> <br />Kevin D. Shortt, PE <br />DocuSign Envelope ID: 800B6267-72A1-4D51-9E6B-C99079CFE415