3 | Page <br /> <br />• MTS setup and test with Mobile Generator <br />• Panelboards/ Switchboards <br /> <br />4) Plumbing <br />Detention Center <br />• Domestic Water Heating System (Geo + 4-NG Instant) <br />• Mixing Valves/ Recirc Pumps <br />• Water Pressure Booster System <br /> <br />Environment & Ag Center <br />• Solar Water Heater System + EWH <br />• Miscellaneous Tempering Valves <br /> <br />Parks Operations Base <br />• Domestic Water Heating System) <br /> <br />2) Retesting allowance (32 hours) <br />3) Documentation all functional testing <br />4) Maintain and Update Action Item List – Assist in resolution <br />5) Attend/ Conduct Cx Progress Meetings (5 budgeted) <br />6) Prepare Final Commissioning report. <br /> <br />TASK 3 – Post Acceptance Phase <br /> <br />1) Perform Opposite Season Testing, Trend Review, etc. <br />2) Update Cx report <br />3) End of Warranty Site Visit (~10 months from completion). <br />4) Prepare End of Warranty Site Visit <br /> <br />FEES <br /> <br />The following is a breakdown of our costs for each phase: <br /> <br />TASK ITEM FEES <br />1 Execution Phase $ 28,076 <br />2 Acceptance Phase $ 76,913 <br />3 Warranty Phase $ 4,827 <br />Total $ 109,816 <br /> <br /> <br />The following overall clarifications are noted relative to the above fee and scope proposals. <br /> <br />1. Facility Dynamics will develop checklists and functional tests based on their <br />experience for systems of these types. <br />2. Facility Dynamics will coordinate the certification of contractors for readiness, <br />completion of installation, prestart and startup. <br />3. Testing reports will be included that document the FPT’s tested. Additional retesting <br />for failed tests will be limited to the allowance above or considered an extra service. <br />DocuSign Envelope ID: 800B6267-72A1-4D51-9E6B-C99079CFE415