Orange County NC Website
Attachment 1, Page 1 <br /> <br /> Quote To: For: Preventive Maintenance Fire Door Program Allison Cooper Cedar Grove Community Ce nter Orange County Asset Management Description: Preventive Maintenance Program Annual Inspection of (5) Fire and Smoke Door Assemblies in accordance With 2010 edition of NFPA 80 Install silencers in fire door assembly frames as needed annually Lubricate fire exit hardware as needed annually Create a data base on our private server for the Cedar Grove Community Center Provide detailed reporting of the Fire Door Inspection for the Cedar Grove Community Center Provide information support for staff for any repairs needed Bar Code the Fire Door Assemblies in the Cedar Grove Community Center Additional assessment will be needed for any door that require relabeling of the fire rated label Make all checks payable to Firebrand Pro, LLC Total $550.00 <br /> <br /> <br />Firebrand Pro, LLC <br />3349 Winston Drive <br />Burlington, NC 27215 <br />Markmitchell45@gmail.com <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Jeff Scouten <br />Environmental Enforcement Supervisor <br />Orange County Solid Waste Management <br />P.O. Box 17177 <br />1207 Eubanks Road <br />Chapel Hill, NC 27516-7177 <br /> <br />RE: Quote OCSWM2020-001 <br /> <br /> <br />Description: <br />Preventive Maintenance Program Annual Inspection of Fire and Smoke Door Assemblies in accordance <br />With 2010 edition of NFPA 80. This inspection includes the following: <br /> <br />1. Perform visual and functional inspection of ( 4 ) Fire and Smoke Door Assemblies <br />This number may change if changes to construction of the building have occurred. <br /> <br />2. Install silencers to Fire Door assemblies as needed <br /> <br />3. Lubricate Fire Exit Hardware as needed <br /> <br />4. Update data base and reports to reflect new bar codes installed by Plant Engineering <br /> <br />5. Update data base and reports to reflect changes in building construction <br /> <br />6. Provide informational support to Plant Engineering staff to repair doors <br /> <br />Project Quoted 7/19/2020 <br />Projected Start Date 11/19/2020 <br /> <br /> <br /> <br /> <br />Total Labor and Materials $550.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Firebrand Pro, LLC <br />3349 Winston Drive <br />Burlington, NC 27215 <br />Markmitchell45@gmail.com <br /> <br />DocuSign Envelope ID: EDB54E21-5E92-449E-82C7-F0AB59E9FBB5