Orange County NC Website
DocuSign Envelope ID:098B7080-775F-4220-9432-FB15222455EA <br /> EAP for Lake Orange Dam, ORANG-005 <br /> Statement of Purpose <br /> The purpose of this plan is to prescribe procedures to be followed in the event of an emergency associated with the Lake <br /> Orange Dam which is caused by an unusually large flood or earthquake, a malfunction (hydraulic or structural)of the <br /> spillway, malicious human activity such as sabotage, vandalism or terrorism, or failure of the dam. <br /> This Emergency Action Plan (EAP) defines responsibilities and procedures to: <br /> • Identify unusual and unlikely conditions that may endanger the dam. <br /> • Initiate remedial actions to prevent a dam failure or minimize the downstream impacts of a dam failure. <br /> • Initiate emergency actions to warn downstream residents of impending or actual failure of the dam. <br /> 5 Revision No: 1(July 2018) <br /> March, 2015 <br />