Orange County NC Website
27 <br /> H. PARKING SENSORS: If the leased space is 100 percent occupied by Government tenants,exterior parking area and parking structure lighting <br /> shall be sensor or BAS controlled in order that it may be programmed to produce reduced lighting levels during non-use. This non-use time period will <br /> normally be from 11:00 pm to 6:00 am. <br /> I. EXTERIOR POWER BACKUP: Exterior egress, walkway, parking lot, and parking structure lighting must have emergency power backup to <br /> provide for safe evacuation of the Building. <br /> J. VIDEO SURVEILLANCE SYSTEM (VSS): Lighting shall be provided in such a manner to adequately support VSS operations, and not limit or <br /> preclude adequate fields of view. <br /> 3.44 ACOUSTICAL REQUIREMENTS(JUN 2012) <br /> A. Reverberation Control. Private office and conference rooms using suspended acoustical ceilings shall have a noise reduction coefficient(NRC) <br /> of not less than 0.65 in accordance with ASTM C-423. Open office using suspended acoustical ceilings shall have an NRC of not less than 0.75. Private <br /> offices,conference rooms,and open offices using acoustical cloud or acoustical wall panels with a minimum of 70%coverage shall have an NRC of not <br /> less than 0.85. <br /> B. Ambient Noise Control. Ambient noise from mechanical equipment shall not exceed noise criteria curve(NC)35 in accordance with the ASHRAE <br /> Handbook of Fundamentals in offices and conference rooms; NC 40 in corridors,cafeterias,lobbies,and restrooms;NC 50 in other spaces. <br /> C. Noise Isolation. Rooms separated from adjacent spaces by ceiling high partitions(not including doors)shall not be less than the following noise <br /> isolation class(NIC)standards when tested in accordance with ASTM E-336: <br /> Conference rooms: NIC 40 <br /> Offices: NIC 35 <br /> D. Testing. The LCO may require,at Lessor's expense,test reports by a qualified acoustical consultant showing that acoustical requirements have <br /> been met. <br /> 3.45 cora IRITY FOR NEW GONSTRI CTION(OCT 2019)INTENTIONALLY DELETED <br /> 3.46 SEISMIC SAFETY C� o�`_«D NEW CONSTRUCTION(OCT 2020)INTENTIONALLY DELETED <br /> 3.47 FIRE PROTECTION FOR NEW GONSTRI CTION(APR 2015)INTENTIONALLY DELETED <br /> 3.48 INTENTIONALLY DELETED <br /> 3.49 INTENTIONALLY DELETED <br /> 3.50 INDOOR AIR QUALITY DURING CONSTRUCTION(OCT 2020) <br /> A. The Lessor shall provide to the Government safety data sheets(SDS)or other appropriate documents upon request,but prior to installation <br /> or use for the following products,including but not limited to,adhesives,caulking,sealants,insulating materials,fireproofing or fire stopping materials, <br /> paints,carpets,floor and wall patching or leveling materials,lubricants,clear finishes for wood surfaces,janitorial cleaning products,and pest control <br /> products. <br /> B. The LCO may eliminate from consideration products with significant quantities of toxic, flammable, corrosive, or carcinogenic material and <br /> products with potential for harmful chemical emissions. Materials used often or in large quantities will receive the greatest amount of review. <br /> C. Where demolition or construction work occurs adjacent to occupied Space,the Lessor shall erect appropriate barriers(noise,dust,odor, <br /> etc.)and take necessary steps to minimize interference with the occupants. This includes maintaining acceptable temperature, humidity,and <br /> ventilation in the occupied areas during window removal,window replacement,or similar types of work. <br /> D. HVAC during Construction: If air handlers are used during construction,the Lessor shall provide filtration media with a MERV of 8 at each <br /> return air grill,as determined by ANSI/ASHRAE Standard 52.2, Method of Testing General Ventilation Air Cleaning Devices for Removal Efficiency by <br /> Particle Size. <br /> E. Flush-Out Procedure: <br /> 1. HVAC flush-out shall commence after construction ends and the Building has been completely cleaned.All interior finishes,such as <br /> millwork,doors,paint,carpet,acoustic tiles,and movable furnishings(e.g.,workstations, partitions), must be installed,and major VOC punch list items <br /> must be finished. <br /> 2. Prior to occupancy, Lessor shall install new filtration media and perform a building flush-out by supplying a total air volume of 14,000 <br /> cubic feet of outdoor air per square foot of gross floor area while maintaining an internal temperature of at least 60°F(15°C)and no higher than 80°F <br /> (27°C)and relative humidity no higher than 60%. <br /> LEASE NO.57-37135-21-FA, PAGE 24 LESSOR: GOVERNMENT: GSA TEMPLATE L100 <br /> REV(10/20) <br /> FPAC V11.13.20 <br />