Browse
Search
Agenda - 06-15-2021; 8-n - USDA Lease of a Portion of the Orange County Bonnie B. Davis Environmental and Agricultural Center
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 06-15-2021 Virtual Business Meeting
>
Agenda - 06-15-2021; 8-n - USDA Lease of a Portion of the Orange County Bonnie B. Davis Environmental and Agricultural Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 4:40:03 PM
Creation date
6/10/2021 4:44:05 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Minutes 06-15-2021 Virtual Business meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
OTHER-2021-030 USDA Lease of a Portion of the Orange County Bonnie B. Davis Environmental and Agricultural Center
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
RES-2021-045-Resolution Orange County Board of Commissioners leasing property ten years
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
109 <br /> Local Area Network (LAN) / Wide Area Network (WAN) / Voice Cabinet <br /> 1. The Government will provide the LAN/WAN/Voice cabinet, and a cable installation contractor will provide <br /> and install the wiring, cabling, and patch panels in the cabinet as specified by the TSD GM. Patch panels will <br /> be RJ-45/110 type and appropriately sized, based upon the number of outlet plates. A wire service loop <br /> that will allow the cabinet to freely move a minimum of six feet in any direction will be installed by the cable <br /> installation contractor as part of the cable installation. The RJ-45/110 type patch panel must be mounted in <br /> the cabinet in the place designated by the TSD GM. <br /> Note: Though not recommended, the patch panels may be installed on the plywood board and the cabling <br /> terminated into them only if required by the lessor. <br /> 2. Where patch panel size and equipment requirements have grown beyond the capacity of a single cabinet, <br /> racks or additional cabinets may be used. However, any additional racks or cabinets need to follow similar <br /> specifications as that original equipment. <br /> 3. Distribution points that have smaller equipment requirements (for example, a single 24-port switch) can <br /> utilize half-height or wall mounted racks, rather than full, floor standing cabinets. However,this equipment <br /> still should be secured and protected in some sort of cabinet. <br /> Direct all questions to OCIO-CEC-IOD-TASB. <br /> Abbreviations / Definitions <br /> • ADP Automated Data Processing <br /> • BSD Business Services Division <br /> • Cat Category(i.e., Cat 6 cable designations) <br /> • CEC Client Experience Center <br /> • DM Departmental Manual <br /> • DR Departmental Regulation <br /> • EIS Enterprise Infrastructure Solutions <br /> • EUC End User Consolidation <br /> • FPAC Farm Production and Conservation <br /> • GM Group Manager <br /> • IOD Infrastructure Operations Division <br /> • LAN Local Area Network <br /> • OCIO Office of the Chief Information Officer <br /> • RD Rural Development <br /> • SC Standard Connector <br /> • SOP Standard Operating Procedures <br /> • ST Straight Tip <br /> • TASB Telecommunications Administration Services Branch <br /> • TSD Technical Support Division <br /> • UPS Uninterruptible Power Supply <br /> • WAN Wide Area Network <br /> • WAP Wireless Access Point <br /> Page 5 Lessor Gov't FPAC V11.13.202020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.