Browse
Search
Agenda - 11-07-2001-8p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 11-07-2001
>
Agenda - 11-07-2001-8p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:54:42 AM
Creation date
8/29/2008 10:35:16 AM
Metadata
Fields
Template:
BOCC
Date
11/7/2001
Document Type
Agenda
Agenda Item
8p
Document Relationships
2001 NS Purchasing - CTL Roofing Consultant Contract Approval
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 20011107
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE CODNTV <br />BOARp OF COMMIS81ONER3 <br />ACTION AGENDA REM ABSTRACT <br />Heeling Date: November ], 2001 <br />Argon Agentla <br />hem No. ~~ <br />SUBJECT: Contract Approval CTL Roofing Consulant <br />DEPARTMENT: Public Works & Pumhasing PUBLIC HEARING: (V/N) No <br />and Centrel Services <br />ATTACHMENT)3): INFORMATION CONTACT: <br /> Wilbert MrAtlao (918) 2462626 <br />CTL Proposal Pam Jones (81912452652 <br />Summary of ROOF ReplacementProjec[a TELEPHONE NUMBERS: <br /> Hillsborough ]92di81 <br /> Chapel HIII 9681581 <br /> Durham 688-7331 <br />PURPOSE: To mnaltler reaming the services of CTL Engineering, Inc. to tlesign the FV 2001- <br />2002 roofing projects on County buildings. <br />BACKGROUND: The County contracted with CTL to conducts roof analysts of ell County <br />buildings in 1998. The study forms the basis of the Cpunty's roof replacement program. <br />Projects recommended for this fecal year include the following: <br />Animal Control BulMing <br />• 503 West FrenNin Street (Skills Devebpment Center) Sec[or 3 <br />Dickson House <br />In atltlition [o these projects, CTL has recomrnendetl that the Count' replace the metal roof on <br />the 129 East King Street building purchased last year and ronovatetl for Purchasing and <br />Centrel Services Department offices. Initial essessmerds indirafed that repeim could solve the <br />roof leaks at the acllhy. Howeveq CTL hea indicated that fie manner in which the roof was <br />installed will create atltlitional leaks and create ongoing maintenance issues. Because of the <br />approach to energy emciency and energy management that the building design follows. it is <br />critlralto ensure that the refter lnaulation remains dry. Funding le availablem etltl this project <br />l0 the 2001-2002 echetluh, so it appears pmdenl t0 complete the work so renovations will In no <br />way be jeopartl¢ed and the energy management strategies may be eHec[ed perthe design. <br />CTL has previously completed roof tlesign work for the County with successful results. Further, <br />much of the baseline information needed for the design process is contained in CTL's database <br />created duriig the roof study. CTL hea aubmMed a proposal a tlesign, prepare specifications, <br />bitl and provitle conatmc[ion oversight far these protects for a total of $17,]00. This fee is <br />consistent with expected has hrprolects of this type. Acopy of the proposal outlining the <br />scope of work in greater tletail is attachetl. <br />CTL is preparetl a begin immetllately upon nobficatlon of accepance of the proposal. If is <br />anticipa[etl that all 2001-2002 rcohng projects would be completed by the end of Bummer 2002. <br />
The URL can be used to link to this page
Your browser does not support the video tag.