Browse
Search
Agenda - 06-15-2021; 8-n - USDA Lease of a Portion of the Orange County Bonnie B. Davis Environmental and Agricultural Center
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 06-15-2021 Virtual Business Meeting
>
Agenda - 06-15-2021; 8-n - USDA Lease of a Portion of the Orange County Bonnie B. Davis Environmental and Agricultural Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 4:40:03 PM
Creation date
6/10/2021 4:14:04 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 15, 2021 Board Meeting
(Attachment)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 06-15-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/16/2021 <br /> 82 <br /> TENANT IMPROVEMENTS COST SUMMARY(TICS) <br /> ADDRESS: DATE SUBMITTED: 2,636 <br /> ABOASF= 2,636 <br /> LESSOR: Orange County RENTABLESF= 3,502 <br /> Masterformat System Elements TI* SHELL** <br /> CSI <br /> Div 1 General Requirements $ $140572 <br /> Div 2 Site work&Demolition $ $456860 <br /> Div3 Concrete $ $52714 <br /> Div 4 Foundations/Mason $ $52714 <br /> Div5 Metals $ $52714 <br /> Div 6 Woods&Plastics $ $5 <br /> Div 7 Thermal&Moisture $ $17571 <br /> Div 8 Doors&Windows $ $52714 <br /> Div9 Finishes $ $52714 <br /> Div 10 Specialties $ $17571 <br /> Div 11 Equipment $ $5.00 <br /> Div 12 Furnishings $ $17571.55 <br /> Div 13 Special Construction $ $5.00 <br /> Div 15 General Construction $ $67657.77 <br /> Div 21 Fire Suppression $ $87857.77 <br /> Div 22 Plumbing $ $67657.77 <br /> Div 23 HVAC $ $87857.77 <br /> Div 26.1 Electrical $ $87857.77 <br /> Div 26.2 Lighting $ $52714.66 <br /> Div 27 Communications,Security&Other Elec.Systems $ $35143.11 <br /> Div 28.1 Electrical safety&Security $ $17571.55 <br /> Div 28.2 Security $ $ <br /> Div 32 Exterior $ $17571.55 <br /> Subtotal Trade Costs $ $ <br /> General Contractor Fee Percent $ $ <br /> Subtotal Construction Costs $ $17571553 <br /> Architectural&Engineering Fees(NIC DID costs) lump sum $ $175715 <br /> Other Lessor Costs Established Under the Lease $ $ <br /> Subtotal Lessor's Costs: $ $ <br /> Lessor's Project Management Fee Percent $ <br /> Total Price to Government: $ <br /> 1757155.33 <br /> Notes: <br /> Include all subcontractors'costs. <br /> "Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS <br /> tab,and the lease for further information. <br /> Page 1 OF 4 <br /> INITIALS:LESSOR: &GOV'T: <br />
The URL can be used to link to this page
Your browser does not support the video tag.