Orange County NC Website
105 <br /> USDAUnited States Department of Agriculture <br /> Wiring and Cabling: Guidelines for FPAC and RD Offices <br /> Version 0.5 <br /> Introduction <br /> Recent updates to two Department Regulations (DRs), DR 3300-001-G and 3300-001-K, supersede the outdated <br /> guidance in DR 3902-001, "Service Center Technology Modernization Project (SCTMP) Wiring/Cabling <br /> Specifications for Service Center Agencies' (SCA) Computer Rooms." As a result, 3902-001 has been cancelled <br /> and should no longer be used.Though it is cancelled, it did have some information that was still useful and <br /> applicable.Therefore,the Office of the Chief Information Officer's Client Experience Center(OCIO-CEC) has <br /> taken that information and documented it in these guidelines to help supplement the references below. <br /> References <br /> 1. DR 3300-001-G, "Sharing of Telecommunications Resources" <br /> 2. DR 3300-001-K, "Installation of Telecommunications Cables in Federal Buildings" <br /> 3. Departmental Manual (DM) 3410-001, "Physical Security Standards for Information Technology(IT) <br /> Restricted Space" <br /> 4. (In DRAFT), "CEC Space and ADP Room Guidelines"Available from OCIO-CEC-Business Services Division. <br /> (BSD) <br /> 5. Technical Support Division (TSD) Site Moves Standard Operating Procedure. (SOP) <br /> Scope <br /> It is expected that with End User Consolidation (EUC) and the award of the new Enterprise Infrastructure <br /> Solutions (EIS) contract that there will be more opportunity and formal guidance forthcoming on facility and <br /> information technology services consolidation. However, until then,these guidelines should be used to assist <br /> with the wiring/cabling needs for only Farm Production and Conservation (FPAC) & Rural Development offices. <br /> (RD) <br /> Responsibilities <br /> The TSD Group Manager(GM) has the authority and responsibility for oversight of the office Automated Data <br /> Processing (ADP) rooms and cabling.They are responsible for providing approval of all cabling plans.The Mission <br /> Area leasing agent is responsible for including all applicable requirements and standards in solicitations. <br /> Questions on these guidelines can be directed to OCIO-CEC's Infrastructure Operations Division, <br /> Telecommunications Administration Services Branch (OCIO-CEC-IOD-TASB). <br /> Page 1 Lessor Gov't FPAC V11.13.202020 <br />