Browse
Search
Agenda - 06-15-2021; 6-a - Approval of Fiscal Year 2021-22 Budget Ordinance, County Grant Projects, and County Fee Schedule
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 06-15-2021 Virtual Business Meeting
>
Agenda - 06-15-2021; 6-a - Approval of Fiscal Year 2021-22 Budget Ordinance, County Grant Projects, and County Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 4:25:01 PM
Creation date
6/10/2021 3:54:52 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for June 15, 2021 Board Meeting
(Attachment)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 06-15-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> Commissioner Approved <br /> Fee Changes for Last <br /> Department/Program Description Current Fee FY 2021-22* Revision <br /> $900Greater than 25 acres of land disturbance ct) N/A(Replacing above use based fees) then per disturbed acre or fraction <br /> thereof,not to exceed 150 acres New <br /> Unscheduled Site Re-Inspection(3) N/A $200 er re-ins ection(3) New <br /> Private Roads $155.00 1998 <br /> Storm water Management Plans $500 per SCM 2019 <br /> Storm water Management Plan Review(LID)(') $300.00 2019 <br /> Conservation Area Document Review $200 per area 2019 <br /> Re-Inspection of Stormwater Control Measure <br /> (SCM) associated with a failed SCM inspection 1st inspection no fee <br /> report N/A $250 er SCM inspection thereafter New <br /> Inspection of Stormwater Control Measure <br /> (SCM) associated with a Notice of Violation <br /> (NOV) N/A $250 er SCM inspection New <br /> Recurring 5-Year Inspection of Stormwater <br /> Control Measure(SCM)(4) $360 per SCM $750 per SCM(4) 2019 <br /> At cost for legal ad and notifications to <br /> process if appealed to Public Hearing <br /> Appeal of Land Disturbing(Grading)Permit N/A ger UDO 2.26.8&9 New <br /> Stream Origin and Intermittent/Perennial Stream Origin and <br /> Determinations Intermittent/Perennial Determinations <br /> 1-2 determinations/site$200 1-2 determinations/site$300 <br /> 3-6 determinations/site$500 3-6 determinations/site$600 <br /> 7-9 determinations/site$1000 7-9 determinations/site$1000 <br /> 10-12 determinations/site$1200 10-12 determinations/site$1200 <br /> Surface Water Identification (SWID) field 13-16 determinations/site$1500 13-16 determinations/site$1500 <br /> work.(s) 17-19 determinations/site$2000 17-19 determinations/site$2000 2012 <br /> Stop Work Order/Notice of Violation(6) N/A $200per order New <br /> Inspection fees <br /> Building <br /> Credit Card use fee(7) N/A 2%of transaction New <br /> Schedule A <br /> New Residential(1&2 family) $0.394/sq.ft.(all trades included) 2018 <br /> Building 0.160/sq.ft./$110.00 Min 2018 <br /> Electrical 0.074/sq.ft./$110.00 Min 2018 <br /> Plumbing 0.074/sq.ft./ $110.00 1 12018 <br /> Mechanical 0.086/sq.ft./$110.00 1 12018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.