Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: November 7, 2001 <br />Action Age da <br />I[em Nn ~- R~ <br />SUB.IECT: Justice Facilities Site Expandetl Master Plan <br />DEPARTMENT: Pumhasing and Central PUBLIC HEARING (YIN) No <br />Services <br />ATTACHMENTIS): INFORMATION CONTACT: <br />Pam Jones (919)245-2fi52 <br />Freeman-While Proposal <br />TELEPHONE NUMBERS: <br />Hillsborough ]3241181 <br />Chapel Hill B68i801 <br />Durham 688-]331 <br />Mebane 338.227-2831 <br />PURPOSE: To censitler retelning Freeman-While ArchkectsbcorWUd an expantletl master <br />plan of the tlownbwn CourVGSC campus. <br />BACKGROUND: The eoerd d Count' Commissbnem approvetl a process for planning antl <br />tlesigning [he proposetl Justice Facilities Expansion during the meeting on September 4, 2001. <br />The Boats tlireGetl fhe Purchasing Oiredw to seek a gopwal for expansion d Me ezieting <br />Master Plan for the Court Campus in oMer m mneitler the potential impala of the <br />reoommendatlons In the preliminary County Space Needs Study and incorporate them as might <br />be appropriate. The Justice Facility Master Plan preceded Ne publication of the preliminary <br />County Space Stutly, which proposes expansion d the Govemmem 3ervicea Center (GSC) <br />end pptemisl removal d Me Govemmem Services Center Annex (GSCA). The GSCIGSCA <br />prged potentially opens new opportunities for syneryistirally providing Parking (or bath the <br />GBGGSGA and the Justice FacilBies pmleds. Adtli8onal infoimetlon la required, however, to <br />ensure that the planning basis far bdh Ne builtlin0 expansion end the perking atrudure le <br />realistic antl makes the rtwst eRGent use of the available lantl. <br />Scope of WoGr <br />The proposed expantletl master plan will expantl the original master plan preperetl for Me court <br />campus to include the GBGGSGA area. Further,8will alro consider the impact of the <br />proposetl future protects on the River Park area. NeMer pmjed being mnsidereq however, <br />will encroach upon the River Park area <br />The proposetl expanded master plan will provitle indepth investigation of the she and will <br />spedFlCally determine the feasibility of a partcing stmdure on the GBGGSGA elte. The <br />expantletl plan will inGUtle the fdlowing major elements: <br />• Sub-surface investigation tp determine the ability pf the soil to support the stmcWres <br />propcsetl; <br />