Orange County NC Website
Bruce Woody <br />April 24, 2020 <br />Page 2 of 3 <br />FEES: These lump sum fees will be invoiced monthly based on our estimation of the percentage complete <br />on each task. <br />1. .. Set Survey Ground Control ............................................................................................ $ 800 <br />2. Aerial Topographic Survey …………………………………………………………………… $3,700 <br />3. Airspace and Compaction Analysis ............................................................................. $750 <br /> <br /> (Note: allowances for reimbursable costs (mileage, printing) are included) <br />DELIVERABLES: The project deliverables will consist of a high resolution orthomosaic photo base image <br />and topographic plat without base image. Drawings are to be in AutoCAD format and presented to the <br />client in PDF form. In addition, DAA will generate a memorandum for file detailing the results of the <br />airspace and compaction analysis. <br />EXCLUSIONS: Deliverables do not include digital source files used in preparing the deliverables <br />described above (for example, MS Word, MS Excel, AutoCad files). <br /> <br />TERMS AND CONDITIONS: The proposed services will be provided in accordance with the conditions <br />presented herein and an existing agreement between Draper Aden Associates and Orange County Solid <br />Waste Management. <br /> <br /> <br />Sincerely, <br /> <br /> <br />C. Tyrus Clayton, PE <br />Principal/ Regional Growth Leader <br /> <br /> <br />cc: Robert Williams (OCSWM) <br />Kristina Witosky (OCSWM) <br />Troy Clayton (DAA) <br />Andrew Mericle (DAA) <br /> <br />DocuSign Envelope ID: E92161F2-3C5B-49FE-846C-A6F5D4E452CE