Browse
Search
Minutes 04-27-2021 Virtual BOCC-Schools Joint Meeting
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2021
>
Minutes 04-27-2021 Virtual BOCC-Schools Joint Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 12:42:00 PM
Creation date
6/2/2021 12:36:15 PM
Metadata
Fields
Template:
BOCC
Date
4/27/2021
Meeting Type
Schools
Document Type
Minutes
Document Relationships
Agenda - 04-27-2021 Virtual BOCC-Schools Joint Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> capital needs in schools. He said 10 years was probably too long, based on growth in Chapel <br /> Hill, but no there is no best practice. <br /> Commissioner Dorosin said he hopes CHCCS will look at race and socio-economic <br /> status during this process, to ensure there are no inequities across the districts. <br /> Commissioner Fowler said there was a decrease in elementary school students over <br /> past year, and noted that CHCCS projected the number would go back up. She said if the <br /> numbers stayed lower it might allow them to relocate students more easily to get some work <br /> done in the elementary schools. <br /> Patrick Abele said there was a change in students doing remote learning, or students <br /> seeking other options. He said CHCCS is enrolling students every day. He said they are <br /> monitoring enrollment, and meet weekly to review class size projection to make sure they are <br /> within capacity limits, and are ready to bring additional requests as needed. He said CHCCS <br /> staff can get a report on current enrollment. <br /> Chair Price asked if there is a year or timeframe when the schools were checked and <br /> abated for asbestos, or will this come up during construction and repairs. <br /> Patrick Abele said it is both. He said asbestos was used in schools to fireproof back in <br /> the 1950s, 1960s, and maybe early 1970s. He said CHCCS must send three-year plans to the <br /> state, as well as conduct semi-annual checks. He said everything is encapsulated and safe, <br /> and if it is not, CHCCS brings in individuals to abate. He said there is money in every year's <br /> budget in case abatement has to happen. He said CHCCS knows where the asbestos is in <br /> most schools (roofs, floor tiles, etc.), and it is highly regulated, tracked and monitored. He said <br /> it is known and they make sure all the regulations are completed for the projects. <br /> Eric Allen said the only other place it could be is in the windowsill caulking in older <br /> schools. <br /> b. OCS Presentation of Capital Needs <br /> Dr. Kathleen Dawson said OCS has finished renovations at Cameron Park Elementary <br /> School Phase 1. She said prior to starting the phase two work, OCS is replacing the flooring, <br /> which does include asbestos abatement, and work will begin this summer to start this process. <br /> She said a number of schools have new roof systems, as well as lighting upgrades. She said <br /> there has been continued replacement of exterior asbestos siding panels. She said there was a <br /> ribbon cutting for the new"J wing" at Cedar Ridge High School. She said students and staff <br /> have already moved in and started classes. She said prep work has begun at the Ag and CTE <br /> site work for the barn. <br /> Dr. Kathleen Dawson said the main work has been replacing roofing and HVAC <br /> systems. She said there was an unexpected increase in the price of materials and labor, which <br /> has made it hard to stay within the budget. She said the supplemental deferred maintenance is <br /> helping to cover additional costs of HVAC work. She said they are finding that in order to <br /> upgrade the system, new electrical, lighting, and fire alarm systems are also required. She said <br /> the question arose of whether to only get a few schools done fully, or if all schools get partial <br /> work. She said they are trying to expedite the projects, especially because good air quality is <br /> necessary due to COVID. <br /> Dr. Kathleen Dawson said OCS was ready to start the Central Elementary project this <br /> summer, but found the HVAC portion was delayed because the materials and equipment could <br /> not be received in time. She said the number of contractors who responded to the bid was <br /> limited, because they are also concerned about labor and material costs. She said OCS is <br /> trying to look at the planned projects to determine what parts can begin now in preparation, so <br /> as soon as materials come in work can begin. She said the hope is to do some of the work this <br /> summer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.