Orange County NC Website
47 <br /> • Update to the Mebane by Design report. <br /> The Contract offers some explanation to the title discrepancies, and the misunderstanding that has occurred over the <br /> title, which was referred to as, "Small Area Plan Study". By virtue of separate Agreement, Orange County agreed to split <br /> the cost of the Study with Mebane. <br /> 1.d. How many meetings were held for the Buckhorn Area Study? <br /> There have been six meetings between 2020 and 2021 that have had a focus on the Buckhorn Area Study, detailed <br /> below: <br /> • November 10, 2020—Joint City of Mebane and Orange County hosted Virtual Open House (Public Comments <br /> Actively Solicited) <br /> • November 23, 2020—BOCC Information Item <br /> • February 16, 2021—BOCC Report Item (Public Comments Taken) <br /> • March 9, 2021—BOCC Work Session with City of Mebane Council <br /> • April 20, 2021—BOCC Regular Item (Public Comments Taken) <br /> • May 17, 2021—Orange County hosted Virtual Public Outreach Meeting (Public Comments Actively Solicited) <br /> Additionally,the City of Mebane Planning Board and City Council conducted meetings on the topic: <br /> • November 9, 2020—Mebane Planning Board approves BAPS and amendment to Mebane's CLDP <br /> • December 7, 2020—Mebane City Council discusses the modification of Mebane's CLDP to include the West Ten <br /> Industrial Site (6016 W.Ten Rd.) and Medline Sites (5512 W.Ten Rd. and 5414 W. Ten Rd.) and to continue to <br /> public hearing until the 1.4.21 Council meeting. <br /> • January 4, 2021—Mebane City Council continues the public hearing, but leans on the decision to not adopt the <br /> Buckhorn Area Study until it is seen by the Orange County Commissioners, and the public hearing was continued <br /> until the 1.6.21 Council meeting. <br /> • January 6, 2021—Mebane City Council votes to amend the CLDP, Mebane by Design, to include West Ten <br /> Industrial Site (6016 W.Ten Rd.), the Medline sites (5512 W.Ten Rd. and 5414 W.Ten Rd.) and Focus Area A <br /> from the Buckhorn Area Study. <br /> 1.e. What are the next steps for the Buckhorn Area Study? <br /> At the time of first drafting this document,the Orange County Planning and Inspections Department was preparing to <br /> host a public outreach session on May 17, 2021 from 6:00 PM—8:00 PM to allow the public to share questions and <br /> comments. Much of the information that fills this document was captured at the public outreach meeting, and some of <br /> the questions have been based on queries that came outside of the scope of the public meeting. <br /> After receiving questions and comments from the public, Orange County Planning will compile this FAQ document and <br /> share it with the BOCC for its June 1, 2021 Business Meeting. The BOCC will decide what future steps are warranted. <br /> 2. Focus Areas of the Buckhorn Area Study <br /> 2.a. What are Focus Areas "A" and "B" from the Buckhorn Area Study? <br /> Focus Areas "A" and "B" are the two areas of interest that grew out of the original Buckhorn Area Study. Focus Area A is <br /> located north of Interstate 40/85 and is zoned EBD-2. Focus Area B is located south of West Ten Road and is zoned R1. <br />