Browse
Search
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:50:16 PM
Creation date
5/17/2021 2:38:57 PM
Metadata
Fields
Template:
Contract
Date
4/26/2021
Contract Starting Date
4/26/2021
Contract Ending Date
4/26/2021
Contract Document Type
Contract
Amount
$29,130.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> SECTION 33 34 00 - FORCE MAINS <br /> C. Clean-up of work for cross country locations shall follow immediately upon completion of <br /> any major part of the work or upon instruction by the Engineer. Topsoil shall be replaced <br /> on all areas of disturbed by the pipeline work throughout the length of the water mains, <br /> and to the full satisfaction of the property owner. Topsoil may be removed from the line <br /> of work and stockpiled for future use. It shall be carefully removed, stockpiled, protected, <br /> respread, dressed off, and the entire right-of-way left in condition acceptable to the <br /> Engineer and property owner. If topsoil is not stockpiled and protected, suitable, <br /> approved material from other sources shall be provided. Where the line is located on <br /> pasture land, grassed areas, or roadway shoulders, grass shall be replaced. <br /> PART 6 - GRASSING <br /> 6.1 The disturbed pipeline area shall be seeded in accordance with Section 32 92 00, Seeding and <br /> Mulching. <br /> PART 7 - INSPECTION AND ACCEPTANCE <br /> 7.1 All work shall be subject to inspection and approval prior to final acceptance and payment. Final <br /> acceptance shall be contingent upon the following: <br /> 7.2 All pressure and leakage tests shall yield satisfactory results. <br /> 7.3 Final clean-up will meet the approval of the Engineer, the Owner, and property owners where <br /> applicable, with all defects in ditch settlement, pavement patches or other deficiencies being <br /> promptly corrected. <br /> END OF SECTION 33 34 00 <br /> Orange County DAA PN R00592-225N2 <br /> Walnut Grove Wastewater System January, 2021 <br /> 33 34 00-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.