DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> SECTION 33 34 00 - FORCE MAINS <br /> E. For mechanical joint pipe, Type II, the rubber rings shall be properly lubricated and the <br /> spigots and bells cleaned before assembling the joint. Nuts of bolted joints shall be <br /> tightened with special torque limiting wrenches set to provide the proper strain on the <br /> bolt, and all nuts tightened to that limit. <br /> F. Rubber ring joints, Type III, shall be assembled in accordance with the manufacturer's <br /> instructions. The bell and spigot shall be absolutely clean prior to seating of the gasket. <br /> The gasket shall be wiped clean, flexed and properly inserted into the socket and seated <br /> evenly and properly. Care shall be taken to eliminate any bulges which might interfere <br /> with the proper entry of the spigot. A thin film of lubricants, shall be applied to the inside <br /> surface of the gasket. The spigot shall then be completed by forcing the spigot into the <br /> bell until it makes contact with the bottom of the socket. This shall be done by use of <br /> pipe jack and assembly, or other methods as approved by the Engineer. <br /> G. Fittings shall be installed where shown on the plans or directed by the Engineer. They <br /> shall be handled and installed in the same manner as the pipe and all shall be well <br /> blocked as hereinafter specified. <br /> H. Concrete for blocking and protection shall be poured in accordance with the following <br /> requirements. All fittings, bends, dead ends, etc., shall be acceptably blocked with <br /> concrete having bearing on undisturbed earth in the side and/or bottom of the trench. <br /> Bearing area shall be equal to that shown on the plans and greater if deemed necessary <br /> by the Engineer. No concrete shall be poured or splattered on fittings bells, glands, or <br /> bolts. <br /> I. Where shown on the plans, or directed by the Engineer, concrete supports, walls, or <br /> other protective work shall be constructed. <br /> J. Contractor shall take elevation shots every 100 feet on the installed force main pipe along <br /> the entire route to ensure positive and uniform grades to each air release valve. The <br /> elevations shall be recorded by the Contractor with a record provided to the Engineer. <br /> 4.5 BACKFILLING OF TRENCHES <br /> A. Backfilling of trenches shall be completed after the installation of each section of pipe <br /> laying to the satisfaction of the Engineer. <br /> B. Backfilling around the pipe and to a depth of at least 1' above the top of pipe shall be <br /> placed by hand in layers of not over 6". Only select material containing no rock or other <br /> objectionable material shall be used for this portion of the backfill. As fast as the material <br /> is place, it shall be cut under the haunches of the pipe with a shovel and thoroughly <br /> compacted with mechanical tamps for the full width of the trench to provide support for <br /> the bottom and sides of the pipe. Filling shall be carried up evenly on both sides. <br /> C. The balance of the backfill shall be placed and tamped to prevent excessive settlement in <br /> a manner satisfactory to the Engineer. If the trench backfill is located under <br /> miscellaneous paved areas, areas to be paved, or unpaved streets, the trench shall be <br /> backfilled with suitable material free from large stones or clods in 8" layers (loose <br /> measurement) and thoroughly tamped and compacted to 95% of maximum as <br /> established by AASHTO Specification T99, Method A, with mechanical tampers, so as to <br /> avoid future settlement. Where applicable, the compaction shall be acceptable to the <br /> Department of Transportation or Owner. <br /> D. For pipe outside street limits, compaction shall be at least 90% maximum as established <br /> by AASHTO Specification T99, Method A. <br /> Orange County DAA PN R00592-225N2 <br /> Walnut Grove Wastewater System January, 2021 <br /> 33 34 00-15 <br />