Browse
Search
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:50:16 PM
Creation date
5/17/2021 2:38:57 PM
Metadata
Fields
Template:
Contract
Date
4/26/2021
Contract Starting Date
4/26/2021
Contract Ending Date
4/26/2021
Contract Document Type
Contract
Amount
$29,130.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> SECTION 33 34 00 - FORCE MAINS <br /> Allowance will be made for a width of the trench not in excess of 16" greater than the <br /> outside diameter of the bell of the pipe and a depth from the surface of the rock to the <br /> established subgrade of the pipeline. Rock excavated in excess of these limits will be <br /> paid for. The Engineer shall measure the amount of rock excavation to be classified as <br /> such before the trench is backfilled before measurement by the Engineer. <br /> M. All blasting, where required, shall be done under the personal supervision of a man <br /> thoroughly skilled in this class of work. All necessary measures to protect life and <br /> property shall be taken. Where in close proximity to building, transmission lines, <br /> telephone lines, or other facilities, timber mats or other means of preventing damage from <br /> flying debris shall be used. Ample and suitable signals shall be given in proximity to work <br /> before each blast, and flagmen shall be placed on all roads, beyond the danger zone, in <br /> every direction to warn traffic. All responsibility for damage rests on the Contractor. <br /> N. All existing water, sewer, and gas lines, buried electrical and telephone cable, and other <br /> known utilities intersecting the lines of construction, if requested by the Engineer, shall be <br /> uncovered by the Contractor at his expense and exposed to the Engineer at least 100' <br /> ahead of pipe laying operations to insure the correctness of grades. Existing utilities <br /> shown on the plans area as accurately located as existing records and field surveys <br /> allow; however, the Contractor shall verify with the various companies before excavating <br /> and shall save harmless the Owner from any claims for damages as a result of his work. <br /> O. The Contractor shall at all time take necessary precautions in preventing gutters, catch <br /> basins, ditches and other drainage facilities from being clogged that might cause flooding <br /> conditions and damage to public or private properties. <br /> P. During the course of pipeline construction, benching, early seeding or grass cover, and <br /> whatever means necessary shall be carried out to prevent siltation and bank erosion. <br /> 4.4 INSTALLATION OF FORCE MAINS AND APPURTENANCES <br /> A. The Contractor shall haul the pipe and appurtenances to the site of work and distribute <br /> them neatly along the trench prior to laying. The pipe shall be carefully handled to <br /> prevent damage, mechanical hoists or other approved methods being used in the <br /> handling. Depth of cover shall not be less than T-0" for pipe up to 8" in diameter or T-6" <br /> for pipes 10" and larger in diameter, measured to the top of pipe, except where shown <br /> differently on a profile or specifically authorized by the Engineer. <br /> B. Pipe and appurtenances shall be kept clean and open ends securely plugged when pipe <br /> laying is not in progress. The inside of pipe and bell and spigots shall be thoroughly <br /> inspected and cleaned prior to lowering into the ditch and care shall be exercised after <br /> the pipe is in place to prevent dirt or other extraneous material from getting into the pipe <br /> or bells and into the spigot. <br /> C. Spigots shall be fully seated in the bells and the pipe shall be uniformly bedded on the <br /> bottom of the trench for its entire length with bells lying in previously dug bell holes <br /> sufficiently large to allow proper bedding and jointing. Fittings, valves and other <br /> appurtenances shall be located where shown on the plans or directed by the Engineer, <br /> with the pipe being cut where necessary. After jointing, a reasonable amount of <br /> deflection may be made in the joint. Such deflection shall not exceed the allowable <br /> amount specified by the manufacturer for each size of pipe. <br /> D. Pipe shall be laid in accordance with the manufacturer's instructions, applicable portions <br /> of AWWA Specification C600, and the following: <br /> Orange County DAA PN R00592-225N2 <br /> Walnut Grove Wastewater System January, 2021 <br /> 33 34 00-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.