Browse
Search
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:50:16 PM
Creation date
5/17/2021 2:38:57 PM
Metadata
Fields
Template:
Contract
Date
4/26/2021
Contract Starting Date
4/26/2021
Contract Ending Date
4/26/2021
Contract Document Type
Contract
Amount
$29,130.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> SECTION 33 34 00 - FORCE MAINS <br /> 4. The Contractor shall also pay the cost of flagmen or other expenses of the <br /> railroad in protecting traffic. He shall notify the railroad of the time that the work <br /> will be done and shall not begin work until authorized by railroad officials. <br /> 4.2 BORED ENCASEMENT INSTALLATION <br /> A. Encasement pipe which is dry bored under highways and railroads for installation of force <br /> mains shall be installed at the locations, to the gradients, and within the tolerances (if <br /> any), as shown on the plans. In event the encasement is installed off grade or seriously <br /> out of line, then another encasement pipe will be dry bored as close as practical to the <br /> original pipe with no additional compensation allowed therefor. The original encasement <br /> must be sealed with a watertight concrete plug (min. 3' deep)at each end. <br /> B. Any additional pipe or other work required for realignment of the force main with an <br /> alternate encasement location which was required due to improper gradient or <br /> misalignment in the original installation, shall be completed at the Contractor's expense. <br /> C. In event an obstruction is encountered during encasement boring operations which <br /> cannot be overcome, a second encasement shall be bored at a location designated by <br /> the Engineer. No additional compensation will be allowed for the second encasement <br /> installation. In event an obstruction is encountered in the second installation, at the <br /> direction of the Engineer, a third attempt shall be made to complete the encasement <br /> installation. Consideration will be given for additional compensation in event a third <br /> installation attempt is required. All abandoned encasement pipes shall be sealed as <br /> specified in paragraph 4.5.1 above. <br /> D. Pipelines installed through steel encasement shall meet specifications herein described <br /> and all Department of Transportation or Railroad specifications and guidelines for <br /> installing pipelines through steel encasement pipe. Upon insertion of the pipeline through <br /> the encasement pipe, the ends of the encasement pipe shall be sealed with brick and <br /> mortar. Brick and mortar shall be as herein specified, and the seal shall be such to <br /> withstand hydrostatic pressure from ground water and all backfill loads. Contractor shall <br /> provide means to prevent water line from floating within the encasement pipe. Grouting <br /> procedure will not be allowed. <br /> E. Casing pipe and joints shall be of leakproof construction, capable of withstanding railway <br /> or traffic loading. The diameter of the casing pipe shall be at least 2" greater than the <br /> largest outside diameter of the carrier pipe, joints, or couplings for carrier pipe less than <br /> 6" in diameter and at least 4" greater for carrier pipe, 6" in diameter and greater, unless <br /> indicated differently on drawings. Further, the casing pipe shall be of great enough <br /> diameter to allow carrier pipe to be removed subsequently without disturbing the case <br /> pipe and immediate areas. <br /> F. Steel encasement pipe shall be as specified in item 2.23 of this section. <br /> 4.3 TRENCH EXCAVATION <br /> A. Trenches for pipe shall be dug true to line and grade and to the following requirements. <br /> Depth of cover shall not be less than 3'-6" for pipe 10" and larger in diameter, measured <br /> to the top of pipe, unless shown differently on the profile or authorized by the Engineer. <br /> B. Sides of trenches shall be kept as nearly vertical as possible. They shall be at least 12", <br /> and not more than 24" wider at the top of the pipe than wide diameter of the pipe, plus <br /> sheathing where it is necessary. Where paving is to be cut, it shall be cut in advance of <br /> trenching 1'wider than the specified width of the trench. <br /> Orange County DAA PN R00592-225N2 <br /> Walnut Grove Wastewater System January, 2021 <br /> 33 34 00-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.