Browse
Search
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:50:16 PM
Creation date
5/17/2021 2:38:57 PM
Metadata
Fields
Template:
Contract
Date
4/26/2021
Contract Starting Date
4/26/2021
Contract Ending Date
4/26/2021
Contract Document Type
Contract
Amount
$29,130.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> SECTION 33 34 00 - FORCE MAINS <br /> THE OWNER and the logs neatly stacked on the edge of the right-of-way or disposed of <br /> in a manner approved by the Engineer. <br /> D. Brush, laps, roots, etc., shall be disposed off-site in a manner approved by the Engineer. <br /> Burning of trees, brush and debris will not be permitted. <br /> E. Grubbing of stumps that are in the way of construction shall be done in any convenient <br /> manner which will not cause damage to remaining trees or adjacent property. Stumps <br /> shall be disposed as for brush or laps above. <br /> F. Limits of the pipe-laying operation shall be confined to the right-of-way and easements. <br /> The width of clearing shall be held to a minimum and in no case wider than the right-of- <br /> way or easement. <br /> 4.3 WORK ON HIGHWAY RIGHT-OF-WAY <br /> A. The Contractor shall not begin work on any property of the Department of Transportation <br /> until he has secured necessary permits and obtained a copy of the R.O.W. encroachment <br /> contract from the Owner. He shall conform to all requirements of the Department of <br /> Transportation; or its authorized representative in the prosecution of this portion of the <br /> work. It shall be the responsibility of each Bidder to contact the local DOT representative <br /> and to determine the exact requirements for work to be done. Requirements shall <br /> include, but are not limited to the following: <br /> B. Where a pipeline crosses under a highway, it shall be installed either by open cut in <br /> tunnel or in encasement under the highway. Materials and method of crossing shall be <br /> as indicated on the plans for each crossing. Where pipe is installed by open cut at least <br /> one full lane for traffic shall be kept open and clear at all times. <br /> C. The Contractor shall provide full-time flagmen, with appropriate red flags, at all times <br /> when work is in progress along highways. <br /> D. Necessary warning and descriptive signs shall be provided and placed at each end of the <br /> working area while work is in progress along highways. These signs shall be well tended <br /> and shall be placed at sufficient distances from the site of the work so that ample warning <br /> is given to approaching traffic. Signs shall be adequately lighted at night and meet <br /> Department of Transportation requirements. <br /> E. The Contractor shall keep all streets open to traffic at all times unless permitted otherwise <br /> by the Engineer or Department of Transportation as applicable. The Contractor shall <br /> provide, place, and maintain temporary traffic control devices as directed by the Engineer <br /> or Department of Transportation. The latest edition of the Manual on Uniform Traffic <br /> Control Devices for Streets and Highways as prepared by the National Joint Committee <br /> on Uniform Traffic Control Devices shall be used as a guide in the placement of devices <br /> and all devices shall meet the requirements of said manual. The removal of road signs <br /> shall be done in accordance with and subject to the approval of the North Carolina <br /> Department of Transportation. Temporary signs shall be furnished and installed by the <br /> Contractor as necessary and as required. All Regulatory Signs shall be replaced <br /> immediately following backfilling or at the end of each day, whichever occurs first. <br /> F. Where pipe is installed in open cut across a highway, the cut shall be immediately <br /> backfilled and all work of repairing the pavement completed immediately. Any <br /> subsequent settlement shall be immediately corrected and repaired. <br /> G. Where pavement is cut and replaced, the Contractor shall cut the edges to a straight and <br /> even line before repairing the pavement. No ragged edges will be allowed or accepted. <br /> Orange County DAA PN R00592-225N2 <br /> Walnut Grove Wastewater System January, 2021 <br /> 33 34 00-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.