Orange County NC Website
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> EXECUTION REQUIREMENTS - 017000 <br /> C. Submit set of Record Documents indicating changes during construction as <br /> required in Section, Submittal Procedures. <br /> D. Submit final Application for Payment identifying total adjusted Contract Sum, <br /> previous payments, and final amount due. <br /> E. Submit the following with final Application for Payment: <br /> 1. Affidavit of Release of Liens <br /> 2. Consent of Surety for Final Payment <br /> 3. Affidavit of Payment of Debts and Claims <br /> 4. Final Certified Payroll Information <br /> F. Submit warranties as required by individual equipment specifications. <br /> 1.4 FINAL CLEANING <br /> A. Clean Project prior to final inspection. Project clean up shall include, but not <br /> be limited to, the following: <br /> 1. Sweep paved areas. <br /> 2. Rake clean landscaped surfaces. <br /> 3. Remove waste, and surplus materials. <br /> 4. Remove temporary construction facilities. <br /> 1.5 FINAL INSPECTION AND TESTS <br /> A. Complete punch list items within 30 days of receipt from Engineer. Owner <br /> may have work not completed within 30 days performed by others with the <br /> cost deducted from the Contractor's final payment. Additional engineering <br /> and inspection services required as a result of Contractor not completing <br /> punch list within 30 days shall be at Contractor's expense. <br /> PART 2 PRODUCTS <br /> NOT USED <br /> PART 3 EXECUTION <br /> NOT USED <br /> END OF SECTION <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Walnut Grove Wastewater Disposal System 01 70 00 - 2 <br /> DAA PN R00592-225N2 August 2020 <br />