Browse
Search
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:50:16 PM
Creation date
5/17/2021 2:38:57 PM
Metadata
Fields
Template:
Contract
Date
4/26/2021
Contract Starting Date
4/26/2021
Contract Ending Date
4/26/2021
Contract Document Type
Contract
Amount
$29,130.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:81E05E8E-EED7-43D3-8B8A-08110E72140A <br /> EXECUTION REQUIREMENTS - 017000 <br /> PART1 GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. Construction Sequence. <br /> B. Close out procedures. <br /> C. Final Cleaning. <br /> D. Adjusting. <br /> 1.2 CONSTRUCTION & COMMISSIONING SEQUENCE <br /> 1. Obtain plan approval and other applicable permits. <br /> 2. Schedule preconstruction meeting with Owner, Engineer, and necessary <br /> personnel. <br /> 3. Install erosion and sediment control as necessary to adequately contain <br /> soils, erosion, and sediment within the project area. <br /> 4. Protect drainage system area. <br /> 5. Remove topsoil from area of construction and stockpile in the designated <br /> area. <br /> 6. Install drainage system and pressure manifold. <br /> 7. Install 2" Schedule 40 PVC forcemain. <br /> 8. Install grinder and forcemain pump within existing concrete tank. Install <br /> pump control panel. <br /> 9. Core existing concrete tank. <br /> 10.Connect piping to grinder and pump. <br /> 11.Contact OWASA and Engineer for inspection. Inspection and acceptance <br /> of the work shall be completed by both the Engineer and an OWASA <br /> representative. <br /> 12.Backfill excavations in compliance with project specifications. <br /> 13.Replace stockpiled topsoil and seed disturbed areas. <br /> 14.Test pump control panel. <br /> 15.After the site is stabilized and when directed by the Engineer, remove all <br /> temporary erosion and sediment control measures and install permanent <br /> vegetation. <br /> 1.3 CLOSE OUT PRODEDURES <br /> A. Submit written certification that Contract Documents have been reviewed, <br /> Work has been inspected, and is complete in accordance with Contract <br /> Documents and ready for Engineer's inspection. <br /> B. Provide submittals to Engineer that are required by governing or other <br /> authorities. <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Walnut Grove Wastewater Disposal System 01 70 00 - 1 <br /> DAA PN R00592-225N2 August 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.