Orange County NC Website
DocuSign Envelope ID:81E05E8E-EED7-43D3-8B8A-08110E72140A <br /> PRODUCT REQUIREMENTS - 016000 <br /> C. For exterior storage of fabricated Products, place on sloped supports, <br /> above ground. <br /> D. Provide off site storage and protection when site does not permit on site <br /> storage. <br /> E. Cover Products subject to deterioration with impervious sheet covering. <br /> Provide ventilation to avoid condensation. <br /> F. Store loose granular Products on solid flat surfaces in a well-drained area. <br /> Prevent mixing with foreign matter. <br /> G. Arrange storage of Products to permit access for inspection. Periodically <br /> inspect to assure Products are maintained under specified conditions. <br /> 1.5 DAMAGED PRODUCTS <br /> A. Remove damaged Products from Project site. <br /> 1.6 PRODUCT OPTIONS <br /> A. Products Specified by Reference Standards: Product meeting standard <br /> and specific requirements of these specifications. <br /> B. The Contract, if awarded, will be on the basis of materials and equipment <br /> specified or described in the Bidding Documents, or or-equal materials <br /> and equipment as defined in the General Conditions, or those substitute or <br /> materials and equipment approved by the Engineer and identified by <br /> Addendum. The materials and equipment described in the Bidding <br /> Documents establish a standard of required type, function and quality to <br /> be met by any proposed substitute or or-equal item. Request for <br /> Engineer's clarification of materials and equipment considered or-equal <br /> prior to the Effective Date of the Agreement must be received by the <br /> Engineer at least 15 days prior to the date for receipt of Bids. No item of <br /> material or equipment will be considered by Engineer as a substitute <br /> unless written request for approval has been submitted by Bidder and has <br /> been received by Engineer at least 15 days prior to the date for receipt of <br /> Bids. Each request shall conform to the requirements of the General <br /> Conditions. The burden of proof of the merit of the proposed item is upon <br /> the Bidder. Engineer's decision of approval or disapproval of a proposed <br /> item will be final. If Engineer approves any proposed substitute item, such <br /> approval will be set forth in an Addendum issued to all prospective <br /> Bidders. Bidders shall not rely upon approvals made in any other manner. <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Walnut Grove Wastewater Disposal System 01 60 00 - 2 <br /> DAA PN R00592-225N2 August 2020 <br />