Orange County NC Website
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> QUALITY CONTROL - 014500 <br /> 1.06 MANUFACTURER'S FIELD SERVICES AND REPORTS <br /> A. When specified in respective Specification Sections, require supplier, <br /> manufacturer, or installer, to provide qualified personnel to observe field <br /> conditions, conditions of surfaces and installation; quality of workmanship; <br /> start-up of equipment; test, adjust, and balance of equipment as <br /> applicable; and to make appropriate recommendations. <br /> B. Manufacturer's representative shall submit a written report to Engineer <br /> listing observations, site decisions, and instructions that are supplemental <br /> or contrary to manufacturer's written instructions. The manufacturer's <br /> representative shall certify that the materials and/or equipment has been <br /> properly installed and is functioning correctly. <br /> 1.07 TESTING <br /> Provide all testing specified in individual Specification Sections. All testing <br /> services shall be arranged for and paid by the Contractor unless otherwise <br /> indicated in the Contract Documents. <br /> 1.08 INSPECTION AND TESTING LABORATORY SERVICES FOR CONCRETE <br /> AND SOILS <br /> A. Where reference is made in the Specifications to tests, inspections, <br /> independent designs, etc., such services shall be furnished by the <br /> contractor. All costs for providing such services shall be paid for by the <br /> contractor. <br /> B. All arrangements for the testing work shall be made by the Contractor. 48 <br /> hour notice is required. Whenever inclement weather does not provide <br /> suitable testing conditions, the Contractor shall be responsible for <br /> cancellation notice to the testing agency. Any costs incurred because of <br /> failure to provide adequate cancellation notice shall be borne by the <br /> Contractor. Engineer shall be notified of arrangements made for testing <br /> work. <br /> C. If a test fails to meet specification requirements, then the area represented <br /> by that test shall be reworked and retested at the Contractor's expense. <br /> Any additional testing required to verify previously failing tests shall be at <br /> the Contractor's expense. All corrective measures shall be documented in <br /> the Quality Control reports. <br /> D. Test reports shall be supplied by the contractor within 3 days of the <br /> completion of such testing. <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Walnut Grove Wastewater Disposal System 01 45 00 - 2 <br /> DAA PN R00592-225N2 August 2020 <br />