Browse
Search
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-205-E-Solid Waste-Full Circle Environmental-Walnut Grove Wastewater Disposal System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:50:16 PM
Creation date
5/17/2021 2:38:57 PM
Metadata
Fields
Template:
Contract
Date
4/26/2021
Contract Starting Date
4/26/2021
Contract Ending Date
4/26/2021
Contract Document Type
Contract
Amount
$29,130.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> SUBMITTAL PROCEDURES - 013300 <br /> provide information unique to this Work in the Shop Drawing <br /> submittal. <br /> 4. Submit the number of copies as follows: <br /> a. Products specified by a national standard: Submit three (3) <br /> copies. This data is for the general information of the <br /> Engineer and for use by the Owner for operation and <br /> maintenance and will not be returned to the Contractor. <br /> b. Other Products: Submit the number of copies specified for <br /> the Shop Drawing. <br /> D. Shop Drawing <br /> 1. Submit the number of copies that Contractor requires, plus three (3) <br /> copies that will be retained by Engineer. <br /> 2. Shop drawings shall consist of drawings, diagrams, illustrations, <br /> schedules, performance charts, brochures and other data, prepared <br /> specifically for a portion of the Work. Shop Drawings shall indicate <br /> the type, size, quantity, arrangement, location, mode of operation, <br /> component materials, utility connections, wiring and control <br /> diagrams, anchorages, supports, factory applied coatings, and <br /> other information necessary to ensure satisfactory fabrication, <br /> installation and operation of the completed Work. Shop Drawings <br /> shall establish the actual detail of manufactured or fabricated items, <br /> indicate proper relation to adjoining work, amplify design details of <br /> mechanical and electrical equipment in proper relation to physical <br /> spaces in the structure, and incorporate minor changes to design <br /> and construction to suit actual requirements. <br /> E. Manufacturer's Installation Procedures <br /> 1. Submit manufacturers' installation procedures to Engineer for review <br /> in the quantities specified for Shop Drawings. <br /> F. Samples <br /> 1. Submit samples as required by the individual specification sections. <br /> Samples shall be physical examples to illustrate the materials and <br /> workmanship. Submit in sufficient size and quantity to clearly <br /> illustrate the functional characteristics of the Product, with integrally <br /> related parts and attachment devices, and the full range of color to <br /> be provided. <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Walnut Grove Wastewater Disposal System 01 33 00 - 5 <br /> DAA PN R00592-225N2 August 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.