Orange County NC Website
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> FULL CIRCLE ENVIRONMENTAL <br /> BID PROPOSAL Environmental Services <br /> ustomer ame: Orange County i um er: <br /> Attention: Steve Gandy ate: 12/12/2021 <br /> Quote is for the ropose Walnut Grove Wastewater Dispersion <br /> Located in: Bid Preparedy: <br /> QUANITY UNIT DESCIPTION UNIT PRICE TOTAL <br /> 1 LS Equipment Mobilization $500.00 $500.00 <br /> 1 LS Effluent Pump and Control Panel Assembly $2,750 $2,750.00 <br /> 1 EA Turnkey 1500 gal Septic Tank Installation $3,750 $3,750.00 <br /> 1 EA Existing Tank Coring(if applicable) $750 $750.00 <br /> 1 EA Existing Tank Pumping(if coring is needed) $400 $400.00 <br /> 1200 LF 2"SCH 40 Force Main $12 $14,400.00 <br /> 1 LS Pressure Manifold and Turnkey Drainfield $4,080 $4,080.00 <br /> 1 LS New 1500 gal Pump Tank ore uiv if needed $2,500 $2,500.00 <br /> TOTAL ESTIMATED-------------------------- $ 29,130.00 <br /> Conditions Of Bid <br /> Proposal by: <br /> Date: <br /> Zach Woody <br /> Full Circle Environmental,LLC <br />