Orange County NC Website
DocuSign Envelope ID:81E05E8E-EED7-43D3-8B8A-08110E72140A <br /> stable surface and secured. There shall be a?' dam of undisturbed earth before a gravel trench <br /> begins. All other trench types per Manufacturer. The pipe shall then be inserted at least 2' into <br /> the corrugated pipe. A clearroat to the ground surface shall be located at the end of the gravity <br /> pipe(the beginning of the draintield)when the drainfie.ld is over 50' from the tank. <br /> 5. The trench bottoms shall he smoothed and level with loose soil removed. <br /> 6. When necessary to change to a new contoCrr, a stela-dawn shall be constructed of a 2' <br /> undisturbed earth dam,which is raised to an elevation equal to ilte upstream gravel surface. <br /> However, precautions shall be taken to prevent raising the level of the effluent in the tank. <br /> Schedule 40 pipe(Y minimum)shall be used in crossing dams. Fittings will be needed to Make <br /> the lurnS. The rigid pipe shall extend at least 2 feet into the level portion of the corrugated pipe. <br /> Area taken up by darns and step-downs shall not count as part of the footage required. <br /> 7. The soil cover over the drainfi.eld shall be to a depth of at least 6". Boulders should be <br /> removed from the backfill material to prevent damage to the pipe. The finished grade shall be <br /> smoothed to prevent ponding of surface water over the drainfield. Surface water from upslope, <br /> including foundation and gutter drains, shall be elTectivciy diverted away. <br /> 8. A vegetative cover of grass over the drainfield shall be established after final grading to <br /> prevent erosion. <br /> Installation and Testing Recommendations: <br /> I, A pre-construction conference is recommended to be attended by the i nstallcr and hCalth <br /> department.prior to begimling construction of the system. <br /> 2. For Accepted treneb products use manufacturer's specifications. Tnstalfcr should be <br /> certified by manufacturer. <br /> 3. The septic tank, dosing tank, risers and pipe penetrations sl}all be demonstrated to be <br /> watertight by a 24-hour leak test(no measurable leakage in 24 hours). The test shall be <br /> run with riser's inlet/outlet pipes installed. <br /> 4. Care shall be taken during installation to prevent extraneous debris from entering tanks, <br /> Supply lines or distribution network. Supply lines and manifold shall be flushed prior to <br /> system start-up. <br /> 5. A pump delivery rate shall be measured and the floats adjusted according to the measured <br /> delivery rate to achieve the design flow at design head. All other mechanical <br /> components, punrrp(s),pump cycling, filters,etc.,as applicable must be dernonstrated to <br /> be fully operable in accordance with their design. <br /> 6. Install water line,electrical lines and other buried utilities around septic and repair areas. <br /> 7. Keel repair areas flee of patking and any i.uture construction. Maintain grass cover over <br /> drainheld and repair areas to stabilize soil from eroding. <br /> 8. Proposed Septic Tank,Pump Tank and Pressure Manifold locations are at the discretion <br /> of the Health Department at time of the prec:otlstruction conference. <br /> 9. Call NC 811 to mark any utilities prior to digging. <br /> Project# 320059 <br />