Orange County NC Website
DocuSign Envelope ID:81 E05E8E-EED7-43D3-8B8A-0811 OE72140A <br /> FORM OF PROPOSAL <br /> Draper Aden Associates Contract: Sanitary Sewer Service Relocation <br /> 114 Edinburg S Drive, Suite 200 Bidder: <br /> PO Box 8181 Hillsborough, INC 27278 Date: <br /> The undersigned, as bidder, hereby declares that the only person or persons interested in this proposal as <br /> principal or principals is or are named herein and that no other person than herein mentioned has any interest in <br /> this proposal or in the contract to be entered into; that this proposal is made without connection with any other <br /> person, company or parties making a bid or proposal; and that it is in all respects fair and in good faith without <br /> collusion or fraud. The bidder further declares that he has examined the site of the work and the contract <br /> documents relative thereto, and has read all special provisions furnished prior to the opening of bids; that he has <br /> satisfied himself relative to the work to be performed. <br /> The Bidder proposes and agrees, if this Proposal is accepted, to contract with the Engineer in the form of contract <br /> specified, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation and <br /> labor necessary to complete all construction of the subject project in accordance with the Drawings, and <br /> Specifications, to the full and entire satisfaction of the Orange County and the Engineer, with a definite <br /> understanding that no money will be allowed for extra work Contract Documents or executed change oreder for <br /> the sum of: <br /> SINGLE PRIME CONTRACT: <br /> Description Unit Estimated Unit Price Total Cost <br /> Quantity <br /> Mobilization/Erosion LS 1 <br /> Control/Demobilization <br /> Grinder Pump and Control LS 1 <br /> Tank 1500 al EA 1 <br /> Core Existing Concrete Tank EA 1 <br /> 2" Schedule 40 PVC, including LF 1,200 <br /> excavation, backfill, and fittings <br /> Pressure Manifold and Drainage Field LS 1 <br /> Misc LS 1 <br /> Items, materials not specifically identified as a unit line item, but nesscessary to complete the project as <br /> shown on the plans and in the technical specifications are considered incidental and shall be included <br /> in the cost of one of the line items above. Contractor shall determine which line item to include the <br /> additional costs based on related items or the sequencing of tasks. <br /> Total Base Bid Price: <br /> Dollars($) <br /> (In Words) <br /> Contractor License Number: <br /> The bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in a written order of the <br /> designer and shall fully complete all work thereunder within the time specified in the General Conditions Article 13. Applicable liquidated <br /> damages amount is also stated in the General Conditions Article 13. <br />