Orange County NC Website
98 <br /> 1 i DPI Facility NeedsSurveyns/Renovations <br /> Project <br /> Glenwood Elementary <br /> Furnishings/ Equipment <br /> Furn.l Eqpt.for Addition*: $18,804,500 x 0.094. = 1,767,623 <br /> Kitchen Equipment: F7 Included for new cafeteria 150,000 <br /> Media Center Furnishings*: Included for new media center 52,000 <br /> Other Furn.l Eqpt. (describe): <br /> Total Furn.1 Eqpt. $1,969,623 <br /> Total Cost of Additions and Renovations: $25,407,652 <br /> Notes/Comments: <br /> 2014 Facilities Needs Survey by Moseley Architects estimate forrenovation, deconstruction & addition is <br /> $24,631,105; total with contingency is $32,020,437 <br /> Justifications Why are these improvements needed? <br /> 1 Replace obsolete facilities <br /> 2. Building Code/ Life Safety <br /> Funding <br /> Likelihood that County will fund project: 150-50 Chance i <br /> If"Very Unlikely,"Why will County <br /> funding not be available? <br /> What other funding sources are Dependent on sucessful 2024 School Bond <br /> available for the project? <br /> 681-320 Glenwood Elementary-3 printed: 4/12/2021 Page 3 of 3 <br />