Browse
Search
Agenda - 05-18-2021; 8-m - Acceptance of Chapel Hill-Carrboro City Schools and Orange County Schools Department of Public Instruction (DPI) Facility Needs Survey Reports
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 05-18-2021 Virtual Business Meeting
>
Agenda - 05-18-2021; 8-m - Acceptance of Chapel Hill-Carrboro City Schools and Orange County Schools Department of Public Instruction (DPI) Facility Needs Survey Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 2:55:04 PM
Creation date
5/13/2021 3:56:28 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-m
Document Relationships
Agenda for May 18, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 05-18-2021 Virtual Business Meeting
OTHER-2021-027 Chapel Hill-Carrboro Schools Long Range Plan 2020-21 DPI Facility Needs Study
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
OTHER-2021-028 Orange County Schools Long Range Plan 2020-21 DPI Facility Needs Study
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
97 <br /> Project2020-21 DPI Facility Needs Survey Cost Worksheet - Add itions/Renovations <br /> 0- 5 Years <br /> . . . Elementary <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ 223,500 Reconfigure and repair 223,500 <br /> Sewer System: ❑ Check box to add sewer system. <br /> Water System (Well): 171 Check box to add a well <br /> Grading/Drainage:$ 26,000 Storm sewer and erosion repair 26,000 <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$1 19,500 lLandscaping, pathways 19,500 <br /> Building/Exteriorl5tructure <br /> Roof Replacement: 80 s.f. X $15.00 per sq, ft. = 1,200 <br /> Structural Repairs:$ <br /> Window Replacement: s.f. <br /> Masonry/Ext. Wall Repairs:$ 7,100 Clean and repair 7,100 <br /> Other Bldg/Exterior(describe):$ 2,700 Lighting and panel repair 2,700 <br /> Interior/Finishes <br /> Partition/Wall Construction:$ <br /> Ceilings: 4,000 s.f. X $5.00 per sq. ft. = 20,000 <br /> Flooring: 75 s.f. X $35.00 per sq. ft. = 2,625 <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$ 11,164 Misc repairs 11,164 <br /> Plumbing/HVACI Electrical <br /> Air Conditioning: s.f. <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ 40,000 Renovate bathroom 40,000 <br /> Other Plbg/HVAC/Elec.(describe):$L 97,376 IPanelboards, gear, efficiency systems 97,376 <br /> Bldg. Code/Life Safety <br /> . Bldg. Code/Life Safety:$ <br /> ADA Ramps/H.C.Access:$ 74,340 Ramps, hardware, parking 74,340 <br /> ADA Toilet Renovations:$ 30,000 Multipurpose room 30,000 <br /> Fire Alarm:$ 14,500 14,500 <br /> Sprinkler System: 95,645 s.f. X $0.04 per sq. ft. = 3,600 <br /> Other Code/Safety(describe):$ <br /> Hazardous Mat'II Environmental <br /> Hazardous Matl.Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental(describe):$ <br /> Other Renovations not incl. above) <br /> Other Renovations (describe)1.$ 57,500 Mechanical systems integration 57,500 <br /> 2.$ <br /> 3.$ <br /> Subtotal: 631,105 <br /> Contingency (10% of renovation cost): 63,111 <br /> Admin. and Design Fees (8.5% of renovation cost): 1 53,644 <br /> Total Renovation Cost: $747,859 <br /> 681-320 Glenwood Elementary-3 printed: 4/12/2021 Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.