| 96
<br />						Facility2020-21 DPI
<br />    																Project
<br />  	Glenwood
<br />     	Additions 		Date:   3/29/2021      								Estimated
<br />     	Academic Classrooms      	Elem   Middle   High   Areas       					Cost
<br />      				Pre-K Clrms:     2     			2,400 Is.f. X $237.50 per sq.ft. =     	570,000
<br />    				Kindergartens:     5     			6,000 Is.f. X $237.50 per sq.ft. =   	1,425,000
<br />   				Grades 1 Cirms:    4     			4,000 Is.f. X $225.00 per sq. ft. =     	900,000
<br />				Grades 2-3 Cirms:     8     			8,000 Is.f. X $225.00 per sq.ft. =   	1,800,000
<br />       			Grades 4-5*Cirms:     8     			6,800 Is.f. X $225.00 per sq.ft. =       '    1,530,000
<br />       			LASS/Math Clrms:
<br />   				Math/Sci Clrms:
<br />     				Science Labs:
<br />     			Science Classrooms:*'
<br />    		Exceptional (self-contained):
<br /> 					Resource:       	4   		1,800  s.f. X $237.50 per sq.ft. =     	427,500
<br />				Computer Rooms:
<br />     	Arts Education			Elem   Middle   Hi h
<br />					Visual Arts:
<br />    				General Music:
<br />      		Instrumental Music(band):
<br />    			Vocal Music(chorus):
<br />    				Dance/Drama:
<br />     	Vocational     			Elem   Middle   High
<br />       			Keyboarding Labs:
<br />      			Prevocational Labs:
<br />      			BusinesSlOfFce Ed:
<br />       			Service/Marketing:
<br />				Technology Labs:
<br />   				Agri/Trade+Ind: JIM
<br />     	Physical Education,etc      	Elem   Middle   High
<br />   		P.E.I Multi/Main Gymnasium:     ❑       ❑       ❑		Check to add new facility
<br />  	I 			Auxiliary Gym:       	71   			Check to add new facility
<br />       			Health/P.E. Clrms:     	h  4Oro
<br />    				Weight Room:
<br /> 					Wrestling:
<br />     	Core Facilities  								i
<br /> 				Media RLV Area:     ❑  		❑	2,671  s.f. X $287.50 per sq.ft. =     	767,913
<br />     			Media Support Area:    				1,200  s.f. X $275.00 per sq.ft. =     	330,000
<br />       				Dining Area:       	❑  		2,064  s.f. X $375.00 per sq.ft. =     	774,000
<br />     				Kitchen Area:    				1,518  s.f. X $375.00 per sq. ft. =     	569,250
<br />       			#of Serving Lines:		1      		320  s.f. X $300.00 per sq.ft. =       	96,000
<br />       				Auditorium:  			❑   MMM
<br />							Admin/Guidance Area:     7,630  s.f. X $250.00 per sq.ft. =   	1,907,500
<br />      							Other/mist.Area:    13,600  s.f. X $250.00 per sq. ft. =   	3,400,000
<br />									Subtotals:    68,003  s.f.     				14,497,163
<br />      						Bldg. Support/Circulation:    20,301  Is.f. X $250.00 per sq. ft. =   	5,075,250
<br />       						Total Area(s.f.)Added:    78,304 I       Const. Cost($249.95/s.f.):  $19,572,413
<br />   					Demolition of Existing.Buildings:1   41,305 Is.f. X $16.25 per sq. ft. =       	671,206
<br />    								Contingency: !  			(5%of Const. Cost)       978,621
<br />      						Admin. and Design Fees: :			(7.5%of Const. Cost)     1,467,931
<br />		*Base-line Cost/sq.ft.:  $250     							Total for Additions:  $22,690,170
<br />      	Land Purchase
<br />							Additional Land Needed:       	Acres x $ L   	/Acre=
<br /> 	681-320  Glenwood Elementary-3       					printed:4/12/2021  	Page 1 of 3
<br /> |