94
<br /> 2020-21 DPI Facility Needs Survey
<br /> .+' 1 Project
<br /> FPG Elementary
<br /> Renovations
<br /> Site Improvements Size/Amount Notes/Description Cost
<br /> Parking/Drives:$ 618,150 Reconfigure and repair 618,150
<br /> Sewer System: ❑ Check box to add sewer system.
<br /> Water System (well): F Check box to add a well.
<br /> Grading/Drainage:$ 156,000 156.000
<br /> Canopy(cov.walk): 44 s.f. X $60.00 per sq.ft. = 2,640
<br /> Other Sitework(describe):$ 39,375 Sidewalks and handrails 39,375
<br /> Building/Exterior/Structure
<br /> Roof Replacement: 9,465 s.f. X $25.71 per sq.ft. = 243,345
<br /> Structural Repairs:$ 324,000 Enclose/repair 3 exterior staircases 324,000
<br /> Window Replacement: 5,724 s.f. X $20.00 per sq.ft. = 114,480
<br /> Masonry/Ext.Wall Repairs:$ 4,800 4,800
<br /> Other Bldg/Exterior(describe):$ 136,400 Signage; mist repairs 136,400
<br /> Interior/ Finishes
<br /> Partition/Wall Construction:$ 21,946 Replace modular walls with stud walls in classrl 21,946
<br /> Ceilings: 45,000 s.f. X $6.00 per sq. ft. = 270,000
<br /> Flooring: 3,510 s.f. X $16.86 per sq. ft. = 59,180
<br /> Painting: s.f.
<br /> Other Bldg/Interior(describe):$ 210,060 Re air water damage,mist 210,060
<br /> Plumbing/HVACI Electrical
<br /> Air Conditioning: 1 66,689 1 s.f. X $25.00 per sq. ft. = 1,667,225
<br /> Electrical Service: s.f.
<br /> Lighting: s.f.
<br /> Computer/Tech. Wiring: s.f.
<br /> Plumbing:$ 1 63,168 113athroom renovations, music and art room rep 63,168
<br /> Other Plbg/HVAC/Elec.(describe):$ 65,353 llnstall new panelboards&gear 66,363
<br /> Bldg. Code/Life Safety
<br /> Bldg. Code/Life Safety:$ 84,600 Enclose"storefront"entrances, doors 84,600
<br /> ADA Ramps/H.C.Access:$ 84,260 Ramps, pathways, parking, egress 84,260
<br /> ADA Toilet Renovations:$ 516,500 Replace, add toilets and sinks 516,500
<br /> Fire Alarm:$
<br /> Sprinkler System: 96,350 s.f. X $1.42 per sq.ft. = 136,710
<br /> Other Code/Safety(describe):$1 72,690 JADA signage, door hardware,water fountains 72,690
<br /> Hazardous Mat'I/Environmental
<br /> Hazardous Mat].Abatement:$
<br /> Indoor Air Quality:$
<br /> Inground Fuel Tanks:$
<br /> Radon Management:$
<br /> Other Environmental (describe):$
<br /> Other Renovations(not incl.above)
<br /> Other Renovations(describe)1.$ 74,400 Chillers and boilers 74,400
<br /> 2.$
<br /> I 3.$
<br /> Subtotal: 4,965,282
<br /> Contingency (10% of renovation cost): 496,528
<br /> Admin. and Design Fees (8.5% of renovation cost): 422,049
<br /> Total Renovation Cost: 1$5,883,859
<br /> 681-316 FPG Elementary-3 printed: 4/12/2021 Page 2 of 3
<br />
|