Browse
Search
Agenda - 05-18-2021; 8-m - Acceptance of Chapel Hill-Carrboro City Schools and Orange County Schools Department of Public Instruction (DPI) Facility Needs Survey Reports
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 05-18-2021 Virtual Business Meeting
>
Agenda - 05-18-2021; 8-m - Acceptance of Chapel Hill-Carrboro City Schools and Orange County Schools Department of Public Instruction (DPI) Facility Needs Survey Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 2:55:04 PM
Creation date
5/13/2021 3:56:28 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-m
Document Relationships
Agenda for May 18, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 05-18-2021 Virtual Business Meeting
OTHER-2021-027 Chapel Hill-Carrboro Schools Long Range Plan 2020-21 DPI Facility Needs Study
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
OTHER-2021-028 Orange County Schools Long Range Plan 2020-21 DPI Facility Needs Study
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
92 <br /> 2020-21 DPI NeedsCost Worksheet ► ••itions/Renovations <br /> f - 5 Years Project <br /> EstesHills Elementary <br /> Furnishings/ Equipment <br /> Furn./Eqpt. for Addition*: $20,625,250 x 0.094. = 1,938,774 <br /> Kitchen Equipment: Included for new cafeteria 153,700 <br /> Media Center Furnishings*: Fy,1 Included for new media center 53,850 <br /> Other Furn.l Eqpt. (describe): <br /> Total Furn.1 Eqpt.1 $2,146,324 <br /> Total Cost of Additions and Renovations: $30,244,311 <br /> Notes/Comments: <br /> 2014 Facilities Needs Survey by Moseley Architects estimated Renovation, Deconstruction &Addition cost <br /> is$28,410,533; total with contingency is $36,933,693 <br /> Justifications Why are these improvements needed? <br /> 1• Replace obsolete facilities <br /> 2. IlBuilding Code / Life Safety <br /> Funding <br /> Likelihood that County will fund project: 50-50 Chance <br /> If"Very Unlikely,"wlhy will County <br /> funding not be available? <br /> What other funding sources are Dependent on sucessful 2024 School Bond <br /> available for the project? <br /> E <br /> 681-312 Estes Hills Elementary-3 printed:4/12/2021 Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.