Orange County NC Website
91 <br /> 1 1 DPI Facility Needs <br /> itProject <br /> Estes Hills Elementary <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ 462,000 Bus parking, lane reconfiguration, service drive 462,000 <br /> Sewer System: ❑ Check box to add sewer system. <br /> Water System (well): Ll Check box to add a well. <br /> Grading/Drainage:$ 95,000 Storm sewer and erosion repair 95,000 <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$1 71,250 ISidewalks, landscaping,fencing 71,250 <br /> Building/Exterior/Structure <br /> Roof Replacement: 4,176 s.f. X $27.39 per sq.ft. = 114,365 <br /> Structural Repairs:$ <br /> Window Replacement: s.f. <br /> Masonry/Ext.Wall Repairs:$ <br /> Other Bldg/Exterior(describe):$ 248,300 Replacement doors, gutters 248,.300 <br /> Interior/Finishes <br /> Partition/Wall Construction:$ <br /> Ceilings: 30,200 s.f. X $5.00 per sq.ft. = 151,000 <br /> Flooring: 40,000 s.f. X $12.50 per sq.ft. = 500,000 <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$ 4,400 Repair water damage 4,400 <br /> Plumbing/HVAC/Electrical <br /> Air Conditioning: s.f. <br /> Electrical Service: s,f. <br /> Lighting: 109,378 s.f. X $3.83 per sq.ft. = 418,381 <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ 20,000 Install new energy efficient gas water heaters 20,000 <br /> Other Plbg1HVACIElec.(describe):$ 370,000 lChillers, boilers, integrate with system 370,000 <br /> Bldg. Code/Life Safety <br /> Bldg. Code/Life Safety:$ 235,050 ADA Doors, hardware,water fountains 235,050 <br /> ADA Ramps/H.C.Access:$ 27,000 Access to playground, parking . 27,000 <br /> ADA Toilet Renovations:$ 3,000 3,000 I <br /> Fire Alarm:$ <br /> Sprinkler System: 109,378 s.f. X $1.01 per sq. ft. = 110,422 <br /> Other Code/Safety(describe):$I 24000 lFront office security 22,000 <br /> Hazardous Mat'll Environmental <br /> Hazardous Matt.Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental (describe):$ <br /> Other Renovations(not Incl. above) <br /> Other Renovations (describe)1.$ <br /> 2.$ <br /> 3.$ <br /> Subtotal: 2,852,168 <br /> Contingency (10% of renovation cost): 285,217 <br /> Admin. and Design Fees (8.5% of renovation cost): .242,434 <br /> Total Renovation Cost: 1$3,379,819 <br /> 681-312 Estes Hills Elementary-3 printed: 4/12/2021 Page 2 of 3 <br />