Orange County NC Website
88 <br /> 2020-21 DPI Facility Needs Survey Cost Worksheet -Add itions/Re n ovations <br /> It Project <br /> Ephesus <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ 30,185 Reconfigure and repair 30,185 <br /> Sewer System: L2 Check box to add sewer system. <br /> Water System (well): El Check box to add a well. <br /> Grading/Drainage:$ 180,900 Grading parking area 180,900 <br /> Canopy(cov.walk): 460 s.f. X $60.00 per sq. ft. = 27,600 <br /> Other Sitework (describe}:$ <br /> Building/Exterior/Structure <br /> Roof Replacement: s.f. <br /> Structural Repairs:$ 82,200 Window, soffit, and door repair 82,200 <br /> Window Replacement: s.f. <br /> Masonry/Ext.Wall Repairs:$ 800 800 <br /> Other Bldg/Exterior(describe):$ 678,800 Lighting and signage 678,800 <br /> Interior/ Finishes <br /> PartitionNVall Construction:$ <br /> Ceilings: 20,000 s.f. X $2.50 per sq. ft. = 50,000 <br /> Flooring: 75 s.f. X $16.00 per sq. ft. = 1,200 <br /> Painting: 6,600 s.f. X $2.50 per sq.ft. = 16,500 <br /> Other Bldg/Interior(describe):$ 247,800 Replace skylights and repair water darnag 247,800 <br /> Plumbing/HVACI Electrical <br /> Air Conditioning: 66,952 s.f. X $25.00 per sq.ft. _ 1,673,800 <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ 33,600 Renovate bathroom 33,600 <br /> Other Plbg/HVAC/Elec.(describe):$1 68,064 llnstall new panelboards&gear 68,064 <br /> Bldg. Code/Life Safety <br /> Bldg. Code/Life Safety:$ <br /> ADA Ramps/H.C.Access:$ 14,400 Replace handrails and guardrails 14,400 <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> Sprinkler System: 117,144 s.f. X $6.09 per sq.ft. = 712,864 <br /> Other Code/Safety(describe):$ <br /> Hazardous Mat'1!Environmental <br /> Hazardous Matl. Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental (describe):$ <br /> Other Renovations(not incl.above) <br /> Other Renovations (describe)1.$ 189,.600 Replace chillers/boilers; integrate to system 189,600 <br /> 2.$ <br /> 3.$ <br /> Subtotal: 4,008,313 <br /> Contingency (10% of renovation cost): 400,831 <br /> Admin. and Design Fees (8.5% of renovation cost): 340,707 <br /> Total Renovation Cost: 1$4,749,851 <br /> i <br /> 681-311 Ephesus Elementary-3 printed:4/12/2021 Page 2 of 3 <br />