Orange County NC Website
86 <br /> 2020-21 DPI Facility Needs Survey Cost Worksheet - Add itio ns/Re novations <br /> Project <br /> Carrboro Elementary <br /> Furnishingsl Equipment <br /> Furn./Eqpt. for Addition*: $17,236,000 x 0.094. = 1,620,184 <br /> Kitchen Equipment: r Included for new cafeteria 153,700 <br /> Media Center Furnishings*: v Included for new media center 53,850 <br /> Other Furn./Eqpt. (describe): <br /> Total Furn./ Eqpt. $1,827,734 <br /> Total Cost of Additions and Renovations: $27,607,321 <br /> Notes/Comments: <br /> 2014 Facilities Needs Survey by Moseley Architects had a cost of$540,000 for the renovation and <br /> $20,904,600 for the addition. Total + contingency=$33,344,752 <br /> Justifications Why are these improvements needed? <br /> 1. lReplace obsolete facilities <br /> 2. IBuilding Code / Life Safety <br /> Funding <br /> Likelihood that County will fund project: 50-50 Chance <br /> If"Very Unlikely,"wlhy will County <br /> funding not be available? <br /> What other funding sources are Dependent on sucessful 2024 School Bond <br /> available for the project? <br /> 681-304 Carrboro Elementary-3 printed:4/12/2021 Page 3 of 3 <br />