Orange County NC Website
85 <br /> Project2020-21 DPI Facility Needs Survey Cost Worksheet -Add itions/Re novations <br /> Carrboro Elementary <br /> Renovations <br /> Site Improvements Size/Amount Notes/ Description Cost <br /> Parking/Drives:$ 654,900 Parking, lane configuration 654,900 <br /> Sewer System: ❑ Check box to add sewer system. <br /> Water System (well): Check box to add a well. <br /> Grading/Drainage:$ 231,800 Stormwater Management 231,800 <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$1 37,750 ISidewalks, landscaping,fencing 37,750 <br /> Building/Exterior/Structure <br /> Roof Replacement: 49,537 s.f. X $25.15 per sq.ft. = 1,245,955 <br /> Structural Repairs:$ <br /> Window Replacement: 75 s.f. X $20.00 per sq.ft. = 1,500 <br /> Masonry/Ext. Wall Repairs:$ 254,400 Re-point masonry, soffit repair 254,400 <br /> Other Bldg/Exterior(describe):$ <br /> Interior/Finishes <br /> PartitionlWall Construction:$ <br /> Ceilings: 35,000 s.f. X $2.50 per sq.ft. = 87,500 <br /> Flooring: 35,000 s.f. X $3.25 per sq.ft. = 113,750 <br /> Painting: 35,000 s.f. X $2.50 per sq.ft. = 87,500 <br /> Other Bldg/Interior(describe):$ 10,700 Replace tackstri s and wall base 10,700 <br /> Plumbing/HVACI(Electrical <br /> Air Conditioning: s.f. <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech. Wiring: s.f. <br /> Plumbing:$ 151,200 Renovate existing bathrooms, add new 151,200 <br /> Other Plbg/HVAC/Elec.(describe):$L 198,704 lRelocate IT racks 108,704 <br /> Bldg. Code/Life Safety <br /> Bldg. Code/Life Safety:$ 605,400 Energy efficiency 605,400 <br /> ADA Ramps/H.C.Access:$ 46,380 lRamp, hand rails, door hardware, grab bars 46,380 <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> f <br /> Sprinkler System: 60,832 s.f. X $1.79 per sq.ft. = 108,704 <br /> Other Code/Safety(describe):$ <br /> Hazardous Mat9l Environmental <br /> Hazardous Matt.Abatement:$ <br /> IIndoor Air Quality:$ 20,000 20,000 <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental(describe):$ <br /> I Other Renovations(not incl. above <br /> Other Renovations (describe)l.$ 427,200 Chillers, boilers 427,200 <br /> 2.$ <br /> 3.$ <br /> ' Subtotal: 4,193,343 <br /> i <br /> Contingency (10% of renovation cost): 419,334 <br /> Admin. and Design Fees (8.5% of renovation cost): 356,434 <br /> Total Renovation Cost: 1$4,969,111 <br /> 681-304 Carrboro Elementary-3 printed: 4/12/2021 Page 2 of 3 <br />