Orange County NC Website
1 1 44 <br /> qF1fi ' - - • •. . • <br /> Partnership Academy School No: 680335 Date: 12/29/2020 <br /> InformationGeneral Building <br /> Form Instructions: Enter building construction history for this school. For example, <br /> original building, classroom addition,mini-gym addition, etc. Also complete the <br /> Building Construction requested information concerning the particular construction.. <br /> History For definition Press Condition or Accessibility <br /> Building Year Built SF Area Condition <br /> Original Building 2006 2006 3600 Excellent In Compliance <br /> Addition 2010 2010 300 1 Excellent In Compliance <br /> School _ SF 6600 Enter the total square feet area of school. <br /> SchoolAcreage 21 Enter the total site acreage of school. <br /> Utility Costs Complete the following utility cost for FY 2019-20. If there are solar arrays on the <br /> site or school roof, complete Solar Energy section. <br /> VALUE OF SOLAR ENERGY($) Scroll <br /> UTILITY COST($) Down <br /> ELEC GAS WATER/SEWER USED SOLD TO UTILITY <br /> 9894 0 2851 0 0 <br /> UTILITY CONSUPTION SOLAR ENERGY CONSUMPTION <br /> ELEC(MW) GAS (THERM) WATER(GAL) USED(MW) SOLD TO UTILITY(MW) <br /> 99 0 55409 <br /> I <br /> Mobile Units <br /> Note: The capacity of mobile classroom units is NOT included in the school <br /> capacity totals. <br /> Mobile Units Type No Teaching Stations no. Capacity <br /> Single Wide Total Teaching Stations <br /> Double Wide Total Teaching Stations <br /> Mega-module Total Teaching Stations <br /> Total from Above Total from Above <br /> Total from Capacity and Needs Plan <br />