Orange County NC Website
304 <br /> , ,-21 , e Needs Survey • • A•• • ovations <br /> School Number: 680-316 Planned Capacity: 712 <br /> Priority: 2 Pre-K Capacity: 0 <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ <br /> Sewer System: Check box to add sewer system. <br /> Water System (well): Check box to add a well. <br /> Grading/Drainage:$ <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$ <br /> Building/Exterior/Structure <br /> Roof Replacement: s.f. <br /> Structural Repairs$ <br /> Window Replacement: s.f. 1 <br /> Masonry/Ext.Wall Repairs.$ <br /> Other Bldg/Exterior(describe):$ <br /> Interior/Finishes <br /> Partition/Wall Construction:$ <br /> Ceilings: s.f. <br /> Flooring: s.f. <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$ <br /> Plumbing/HVAC/Electrical <br /> Air Conditioning: s.f. <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ <br /> Other Plbg/HVAC/Elec.(describe):$ <br /> Bldg.Code/Life Safety <br /> Bldg. Code/Life Safety:$ <br /> ADA Ramps/H.C.Access:$ <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> Sprinkler System: s.f. <br /> Other Code/Safety(describe):$ <br /> Hazardous Mat9/Environmental <br /> Hazardous Matl.Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental(describe):$ <br /> Other Renovations(not incl.above) _ <br /> Other Renovations (describe)l.$ 1,718,875 renovations 1,718,875 <br /> 2.$ 702,600 Unfunded Major Projects 702,600 <br /> 3.$ 277,400 Unfunded facilities Care Projects 277,400 <br /> Subtotal: 2,698,875 <br /> Contingency (10% of renovation cost): 269,888 <br /> Admin. and Design Fees (8.5% of renovation cost): 229,404 <br /> Total Renovation Cost: $3,198,167 <br /> 680-316 Charles W Stanford Middle-4 printed: 4/13/2021 Page 2 of 3 1 <br />