Orange County NC Website
291 <br /> a � � • • Add • • • <br /> 2020-21 School Number: 680-304 Planned Capacity: 748 <br /> Priority: 1 Pre-K Capacity: 0 <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ <br /> Sewer System: ❑ Check box to add sewer system. <br /> Water System(well): LJ Check box to add a well. <br /> Grading/Drainage:$ <br /> Canopy(cov,walk): s.f. <br /> Other Sitework(describe):$ <br /> Building/Exterior/Structure <br /> Roof Replacement: s.f. <br /> Structural Repairs:$ <br /> Window Replacement: s.f. <br /> Masonry/Ext.Wall Repairs:$ <br /> Other Bldg/Exterior(describe):$ <br /> Interior/Finishes <br /> Partition/Wall Construction:$ <br /> Ceilings: s.f. <br /> Flooring: s.f. <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$ <br /> Plumbing/HVAC/Electrical <br /> Air Conditioning: s.f. <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ <br /> Other Plbg/HVAC/Elec.(describe):$ <br /> Bldg.Code/Life Safety <br /> Bldg.Code/Life Safety:$ <br /> ADA Ramps/H.C.Access:$ <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> Sprinkler System: s.f. <br /> Other Code/Safety(describe):$ <br /> Hazardous Mat'I/Environmental <br /> Hazardous Matl.Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental(describe):$ <br /> Other Renovations not incl.above) <br /> Other Renovations(describe)l.$ 4,312,015 HVAC renovation 4,312,015 <br /> 2.$ 276,100 Unfunded Facilities Care Projects 276,100 <br /> 3.$ <br /> Subtotal: L4,588,1115 <br /> Contingency (10% of renovation cost): 58,812 <br /> Admin. and Design Fees (8.5% of renovation cost): 89,990 <br /> Total Renovation Cost: 36,916 <br /> 680-304 A L Stanback Middle-4 printed: 4/13/2021 Page 2 of 3 <br />