Orange County NC Website
282 <br /> 2020-21 DPI Facility Needs Survey <br /> . � P ' . <br /> School Number: 680-336 Planned Capacity: 0 <br /> Pathways Elementary_ Priority: 4 Pre-K Capacity: 0 <br /> Furnishings/ Equipment <br /> Furn./Eqpt.for Addition*: <br /> Kitchen Equipment: F Check to add kitchen equipment <br /> Media Center Furnishings*: P Check to add media center furnishings <br /> Other Furn./Eqpt. (describe): <br /> Total Furn./Eqpt. <br /> Total Cost of Additions and Renovations: $3,217,275 <br /> Notes/Comments: <br /> Justifications: (Why are these improvements needed?) <br /> 1. Building Code/ Life Safety <br /> 2. Depreciation/ Deferred Maintenance <br /> School Planning <br /> NC Department of Public Instruction <br /> q r Safe and Healthy Schools Division <br /> 680-336 Pathways Elementary-4 printed: 4/13/2021 Paqe 3 of 3 <br />