Browse
Search
Agenda - 05-18-2021; 8-m - Acceptance of Chapel Hill-Carrboro City Schools and Orange County Schools Department of Public Instruction (DPI) Facility Needs Survey Reports
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 05-18-2021 Virtual Business Meeting
>
Agenda - 05-18-2021; 8-m - Acceptance of Chapel Hill-Carrboro City Schools and Orange County Schools Department of Public Instruction (DPI) Facility Needs Survey Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 2:55:04 PM
Creation date
5/13/2021 3:56:28 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-m
Document Relationships
Agenda for May 18, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 05-18-2021 Virtual Business Meeting
OTHER-2021-027 Chapel Hill-Carrboro Schools Long Range Plan 2020-21 DPI Facility Needs Study
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
OTHER-2021-028 Orange County Schools Long Range Plan 2020-21 DPI Facility Needs Study
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> 2020-21 • Facility Needs <br /> / Capacity Calculator <br /> 3/31/2021 <br /> General Building Information <br /> Form Instructions: Enter building construction history for this school. For example, <br /> original building,classroom addition,mini-gym addition,etc. Also complete the <br /> Construction requested information concerning the particular construction.. <br /> History <br /> For definition!Press Condition or Accessibility <br /> Year Built SF Are��j Condition Accessibility <br /> Original Building 1952 1 4489 Poor Unsatisfactory <br /> Classroom Addition 1954 7471 Poor Unsatisfactory <br /> Primary Addition 1959 11640 Poor Unsatisfactory <br /> Multipurpose Addition 1986 12200 Fair Partial Compliance <br /> Media Center Addition 1996 964 Fair Partial Compliance <br /> :School TotalSF 51722 Enter the total square feet area of school. <br /> 'School Site Acreage Acreage 10 Enter the total site acreage of school. <br /> Utility Costs Complete the following utility cost for FY 2019-20. If there are solar arrays on the <br /> site or school roof,complete Solar Energy section. <br /> Scroll <br /> Down <br /> ELEC GAS WATER 1 SEWER USED SOLD TO UTILITY <br /> 44406 5497 8425 0 0 <br /> ELEC(MW) GAS(THERM) WATER(GAL) USED(MW) ! SOLD TO UTILITY(MW) <br /> 529 10,310 513000 <br /> Mobile Note:The capacity of mobile classroom units is NOT included in the school <br /> capacity totals. <br /> Mobile Units Type No Teaching Stations no. I Capacity <br /> Single Wide Total Teaching Stations <br /> Double Wide 5 Total Teaching Stations 4 <br /> Mega-module Total Teaching Stations <br /> Total from Above Total from Above <br /> Total from Capacity and Needs <br />
The URL can be used to link to this page
Your browser does not support the video tag.