Orange County NC Website
278 <br /> 2020-21 DPI Facility Needs Survey Cost Worksheet-Add itions/Renovations <br /> qr 0 Project <br /> School Number: 680-336 Planned Capacity: 536 <br /> Priority: 2 Pre-K Capacity: 72 <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ <br /> Sewer System: Check box to add sewer system. <br /> Water System (well): LJ Check box to add a well. <br /> Grading/Drainage:$ <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$ <br /> Building/Exterior/Structure <br /> Roof Replacement: s.f. <br /> Structural Repairs:$ <br /> Window Replacement: s.f. <br /> Masonry/Ext.Wall Repairs:$ <br /> Other Bldg/Exterior(describe):$ <br /> Interior/Finishes <br /> Partition/Wall Construction:$ <br /> Ceilings: s.f. <br /> Flooring: s.f. <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$ <br /> Plumbing/HVAC/Electrical <br /> Air Conditioning: s.f. <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ <br /> Other Plbg/HVAC/Elec.(describe):$ <br /> Bldg.Code/Life Safety <br /> Bldg.Code/Life Safety:$ <br /> ADA Ramps/H.C.Access:$ <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> Sprinkler System: s.f. <br /> Other Code/Safety(describe):$ <br /> Hazardous Mat'I/Environmental <br /> Hazardous Matl.Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental(describe):$ <br /> Other Renovations not incl.above) <br /> Other Renovations(describe)l.$ 364,805 364,805 <br /> 2.$ 146,600 Unfunded facilities Care Projects 146,600 <br /> 3.$ <br /> Subtotal: 511,405 <br /> Contingency(10% of renovation cost): 51,141 <br /> Admin. and Design Fees (8.5% of renovation cost): 43,469 <br /> Total Renovation Cost: $606,015 <br /> 680-336 Pathways Elementary-4 printed: 4/13/2021 Page 2 of 3 <br />