Orange County NC Website
253 <br /> 1 1"r 2020-21 DPI Facility Needs Survey Cost Worksheet-Add itions/Renovations <br /> School Number: 680-329 Planned Capacity: 520 <br /> _- = Priority: 2 Pre-K Capacity: 0 <br /> Furnishings/ Equipment <br /> Furn./Eqpt.for Addition*: <br /> Kitchen Equipment: Check to add kitchen equipment <br /> Media Center Furnishings*: Check to add media center furnishings <br /> Other Furn./Eqpt. (describe): - <br /> Total Furn./Eqpt. <br /> Total Cost of Additions and Renovations: $20,006,098 <br /> Notes/Comments: <br /> Justifications Why are these improvements needed? <br /> 1 Building Code/ Life Safety <br /> 2. Depreciation/ Deferred Maintenance <br /> Funding <br /> Likelihood that County will fund project: <br /> If"Very Unlikely,"wlhy will County <br /> funding not be available? <br /> What other funding sources are <br /> available for the project? <br /> 680-329 Hillsborough Elementary-4 printed: 4/13/2021 Page 3 of 3 <br />