Orange County NC Website
240 <br /> 2020-21 DPI Facility Needs Survey Cost Worksheet - Add itio n s/Renovations <br /> 1Project <br /> School Number: 680-328 Planned Capacity: 507 <br /> Priority: 2 Pre-K Capacity: 0 <br /> Furnishings/ Equipment _ <br /> Furn./Eqpt.for Addition*: <br /> Kitchen Equipment: Check to add kitchen equipment <br /> Media Center Furnishings*: L1 Check to add media center furnishings <br /> Other Furn./Eqpt. (describe): <br /> Total Furn./Eqpt. <br /> Total Cost of Additions and Renovations: $5,206,954 <br /> Notes/Comments: <br /> Projects identified in the Orange County Schools 2013 Comprehensive Facilities Assessment <br /> Justifications Why are these improvements needed? <br /> 1. Air Conditioning / Energy Conservation <br /> 2. Depreciation/ Deferred Maintenance <br /> Funding <br /> Likelihood that County will fund project: Very Unlikely <br /> If"Very Unlikely,"wlhy will County Anticipated renovation needs are gretare than CIP <br /> funding not be available? <br /> What other funding sources are 2016 Bond <br /> available for the project. <br /> 680-328 Grady Brown Elementary-4 printed:4/13/2021 Page 3 of 3 <br />