Orange County NC Website
227 <br /> 2020-21 DPI Facility Needs Survey Cost Worksheet - Additions/Renovations <br /> T � 1Project <br /> School Number: 680-324 Planned Capacity: 587 <br /> a......_ r._. Priority: 2 Pre-K Capacity: 36 <br /> Furnishings/ Equipment <br /> Furn./Eqpt.for Addition*: <br /> Kitchen Equipment: Check to add kitchen equipment <br /> Media Center Furnishings*: Check to add media center furnishings <br /> Other Furn./Eqpt. (describe): <br /> Total Furn./Eqpt. <br /> Total Cost of Additions and Renovations: $7,419,962 <br /> Notes/Comments: <br /> Projects identified in the Orange County Schools 2013 Comprehensive Facilities Assessment <br /> Justifications Why are these improvements needed? <br /> 1. Air Conditioning / Energy Conservation <br /> 2. Depreciation/ Deferred Maintenance <br /> Funding <br /> Likelihood that County will fund project: lVery Unlikely <br /> If"Very Unlikely,"wlhy will County Needs greater than CIP <br /> funding not be available? <br /> What other funding sources are 2016 Bond <br /> available for the project. <br /> 680-324 Efland Cheeks Elementary-4 printed: 4/13/2021 Page 3 of 3 <br />