Orange County NC Website
200 <br /> �j ' ,-21 DPI Facility <br /> Needs" Cost WorksheetA••itio ovations <br /> Project <br /> School Number: 680-308 Planned Capacity: 597 <br /> Priority: 1 Pre-K Capacity: 0 <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ <br /> Sewer System: ❑ Check box to add sewer system. <br /> Water System(well): Check box to add a well. <br /> Grading/Drainage:$ <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$ <br /> Building/Exterior/Structure <br /> Roof Replacement: s.f. <br /> Structural Repairs:$ <br /> Window Replacement: s.f. <br /> Masonry/Ext.Wall Repairs:$ <br /> Other Bldg/Exterior(describe):$ <br /> Interior/Finishes <br /> Partition/Wall Construction:$ <br /> Ceilings: s.f. <br /> Flooring: s.f. <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$ <br /> Plumbing/HVAC/Electrical <br /> Air Conditioning: s.f. <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ <br /> Other Plbg/HVAC/Elec.(describe):$ <br /> Bldg.Code/Life Safety <br /> Bldg. Code/Life Safety:$ <br /> ADA Ramps/H.C.Access:$ <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> Sprink"Syste s.f. <br /> Other Code/Safety <br /> Hazardous Mat'I/Environmental <br /> Hazardous Matl.Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental(describe):$ <br /> Other Renovations not incl.above) <br /> Other Renovations(describe)1.$ 1,250,000 renovations 1,250,000 <br /> 2.$ 9,768,375 Unfunded Major Projects 9,768,375 <br /> 3.$ 208,500 Unfunded facilities Care Projects 208,500 <br /> Subtotal: 11,226,875 <br /> Contingency(10% of renovation cost): 1,122,688 <br /> Admin. and Design Fees (8.5% of renovation cost): 954,284 <br /> F Total Renovation Cost: 13,303,847 <br /> J <br /> 680-308 Cameron Park Elementary-4 printed:4/13/2021 Page 2 of 3 <br />