Orange County NC Website
142 <br /> 2020-21 DPI Facility Needs Survey Cost Worksheet - Add itions/Renovations <br /> ! Project <br /> East Chapel Hill • <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ 75,000 Bus driveway 75,000 <br /> Sewer System: ❑ Check box to add sewer system. <br /> Water System (well): Check box to add a well. <br /> Grading/Drainage:$ <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$1 100,000 IField improvements 100,000 <br /> Building/Exterior/Structure <br /> Roof Replacement: s.f. <br /> Structural Repairs:$ <br /> Window Replacement: s.f. <br /> Masonry/Ext. Wall Repairs:$ <br /> Other Bldg/Exterior(describe):$ <br /> Interior/ Finishes <br /> PartitionA[Vall Construction:$ <br /> Ceilings: s.f. <br /> Flooring: s.f. <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$ 1,400,000 Theater lighting and sound 1,400,000 <br /> Plumbing/HVAC/Electrical <br /> Air Conditioning: 259,869 s.f. X $25.00 per sq.ft. = 6,496,725 <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ <br /> Other PIbg/HVAC/Elec.(describe):$ <br /> Bldg. Codel Life Safety <br /> Bldg. Code/Life Safety:$ <br /> ADA Ramps/H.C.Access:$ <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> Sprinkler System: s.f. <br /> Other Code/Safety(describe):$ <br /> Hazardous MafI/Environmental <br /> Hazardous Mat].Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental (describe):$ <br /> Other Renovations not incl.above) <br /> Other Renovations (describe)1.$ <br /> 2.$ <br /> 3.$ <br /> Subtotal: 8,071,725 <br /> Contingency (10% of renovation cost): 807,173 <br /> Admin. and Design Fees (8.5% of renovation cost): 686,097 <br /> Total Renovation Cost: $9,564,994 <br /> 681-314 East Chapel Hill High-4 printed: 4/12/2021 Page 2 of 3 <br />