Orange County NC Website
125 <br /> 2020-21 DPI _ , s Survey Cost Worksheet -Add itio ns/Ren ovations <br /> Project <br /> Phillips Middle <br /> Furnishings/ Equipment <br /> Furn./Eqpt.for Addition": $3,645,500 x 0.094. = 342,677 <br /> Kitchen Equipment: Check to add kitchen equipment 160,600 <br /> Media Center Furnishings": Check to add media center furnishings <br /> Other Furn./Eqpt. (describe): <br /> Total Furn.1 Eqpt. $5D3,277 <br /> Total Cost of Additions and Renovations: $14,449,563 <br /> Notes/Comments: <br /> 2014 Facilities Needs Survey by Moseley Architects estimated the project at$11,427,134; total with <br /> contingency is$14,855,274. <br /> Justifications Why are these improvements needed? <br /> I. lReplace obsolete facilities <br /> 2. JAir Conditioning 1 Energy Conservation <br /> Funding <br /> Likelihood that County will fund project: 50-50 Chance <br /> If"Very Unlikely,"wlhy will County <br /> funding not be available? <br /> What other funding sources are Dependent on sucessful 2024 School Bond <br /> available for the project? <br /> 681-324 Phillips Middle-3 printed: 4/12/2021 Page 3 of 3 <br />