Orange County NC Website
124 <br /> 1 1 DPI Facility NeedsA..itions/Renovations <br /> 1Project <br /> Phillips Middle <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ 343,620 Repair and reconfigure 343,620 <br /> Sewer System: Check box to add sewer system. <br /> Water System (well): Ll Check box to add a well. <br /> Grading/Drainage:$ 75,000 Storm sewer and regrading 75,000 <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$ <br /> Building/Exterior!Structure <br /> Roof Replacement: 64,483 s.f. X $25.24 per sq.ft. = 1,627,795 <br /> Structural Repairs:$ <br /> Window Replacement: s.f. <br /> Masonry/Ext. Wall Repairs:$ 90,600 Repair and replace 90,600 <br /> Other Bldg/Exterior(describe):$ 122,000 Sidewalks, landscaping, signage, lighting 122,000 <br /> Interior/ Finishes <br /> PartitionMall Construction:$ <br /> Ceilings: 35,000 s.f. X $6.00 per sq.ft. = 210,000 <br /> Flooring: 40,750 s.f. X $10.83 per sq.ft. = 441,250 <br /> Painting: 109,498 s.f. X $0.16 per sq.ft. = 18,000 <br /> Other Bldg/Interior(describe):$1 463,000 lRepair water damage, casework 463,000 <br /> Plumbing/HVAC/Electrical <br /> Air Conditioning: s.f. <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech. Wiring: s.f. <br /> Plumbing:$ 109,200 Bathroom renovations 109,200 <br /> Other Plbg/HVAC/EIec.(describe):$ 891,550 Panelboards, efficiency equipment and system 891,550 <br /> Bldg.Code/Life Safety <br /> Bldg. Code/Life Safety:$ 487,110 Fireproof doors, security vestibule 487,110 <br /> ADA Ramps/H.C.Access:$ 159,260 Parking, pathways, interior access 159,260 <br /> ADA Toilet Renovations:$ 248,800 Bathroom and locker room renovations 248,800 <br /> Fire Alarm:$ <br /> Sprinkler System: 124,588 s.f. X $2.55 per sq. ft. = 317,640 <br /> Other Code/Safety(describe):$r 96,120 1ADA Door hardware and signage 96,120 <br /> Hazardous Mat'll Environmental <br /> Hazardous Matl,Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental (describe):$ <br /> Other Renovations(not incl.above) <br /> Other Renovations (describe)1.$ 453,600 Mechanical systems integration 453,600 <br /> 2.$ 597,000 Add bathrooms to field house, rpeair bleachers 597,000 <br /> 3.$ 55,000 Industrial Arts and Band Room renovations 55,000 <br /> Subtotal: 6,806,545 <br /> Contingency (10% of renovation cost): 680,655 <br /> Admin. and Design Fees (8.5% of renovation cost): 578,556 <br /> Total Renovation Cost: $8,065,756 <br /> 681-324 Phillips Middle-3 printed:4/12/2021 Page 2 of 3 <br />